Similar Projects
Kingston Elementary School Site Paving
Infrastructure
Bidding
Kingston, IL 60145

2022 Concrete Program - PCC Replacement
Alteration
Bidding
Sycamore, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Pavement Upgrades
Post-Bid
Malta, IL 60150

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Culvert Removal and Replacement
Results
Less than $46,536 est. value
De Kalb, IL 60115

Irrigation Design Services For River Heights And Buena Vista Golf Courses (Phase 1)
Infrastructure
Bidding
$1,500,000 est. value
Dekalb, IL 60115

2021 General Road Materials
Post-Bid
De Kalb, IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Resurfacing, Sidewalks, Curb and Gutter, Pavement Markings
Results
Genoa, IL 60135

Driveway and Parking Lot Repair/ Replacement
Infrastructure
Post-Bid
Sandwich, IL 60548

2021 Crack Routing and Filing
Results
Less than $40,968 est. value
De Kalb, IL

Civic Apartments Water and Waste Line Replacement
Alteration
Post-Bid
Sycamore, IL 60178

DeKalb Streets 2021
Results
Less than $1,295,960 est. value
IL

Last Updated 03/22/2022 08:40 AM
Project Title

2022 Water Main and Street Improvements

Physical Address View project details and contacts
City, State (County) Sycamore, IL 60178   (DeKalb County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $261,663,380 to $281,359,980
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed construction consists of installing approximately 3,960 lineal feet of new 8-inch water main and 2,060 lineal feet of new 10-inch water main, including new hydrants, valves; and other miscellaneous items of work. The contract will include all work necessary to install the water main; install water service lines via directional drilling and open cut methods; reconnect existing water service lines; roadway paving and reconstruction; concrete curb and gutter removal and replacement; concrete sidewalk removal and replacement; and perform all restoration to return the area to its original condition and other miscellaneous items of work. No exact estimate is available. For bonding purposes, the project is over $2M.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents