Similar Projects
Facility Reroofing - FSU Campus Dining and Kitchen Renovation
Post-Bid
Tallahassee, FL

Irma Phase II Reroof at Avon Park Correctional Facility
Post-Bid
Avon Park, FL 33825

Roof Replacement at Various Recreation Centers
Results
Less than $560,889 est. value
The Villages, FL

Roof Replacement of Covered Walkways
Results
$115,000 est. value
Seminole, FL

Capitol Tower, House and Senate Roof Replacement
Construction
Tallahassee, FL

FDC Wakulla CI/Liberty CI Hurricane Irma Re-Roofing
Construction
Crawfordville, FL 32327

Roof Replacement Services (Immokalee)
Post-Bid
Immokalee, FL 33143

Roof Replacement of Parkway WRF Operations Building and Sandhill Water Reclamation Facility South Generator Building
Results
Kissimmee, FL

Phase II of Fire Training Facility - (Fire Training Tower & Roof Prop Modifications)
Construction
Lake Mary, FL 32746

Roof Replacement Services (Naples)
Post-Bid
Naples, FL 34117

Canopy Roof Replacements Fuguitt Elementary School
Results
$94,000 est. value
Largo, FL 33773

Roof Replacement Services (Big Cypress)
Post-Bid
Clewiston, FL 33440

Repair Roof and Fascia in Multiple Buildings
Results
$25,000 to $100,000 est. value
Homestead, FL 330391299

Roofing Replacement Florida Department of Corrections Region 3 Project A Hurricane Repairs
Post-Bid
Avon Park, Bowling Green, Zephyrhills, FL 32301

Miscellaneous Roof Repairs Multiple Buildings
Results
$25,000 to $100,000 est. value
Homestead, FL 330391299

Last Updated 08/09/2019 11:29 AM
Project Title

Avon Park High Building 300 Partial Reroof

Physical Address View project details and contacts
City, State (County) Avon Park, FL 33825   (Highlands County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Furnish all material, labor and equipment to reroof a portion of building 300 at Avon Park High School in Avon Park, florida. Demolition of the existing roof system includes: Removal of ail existing Built-up Roofing down to the existing gypsum deck. Because the current tapered insulation was Installed with Polymer Fasteners and Polymer Fastener Insulation Plates, the contractor shall remove, by unscrewing, all existing fasteners to minimize the damage to the gypsum deck. Remove all existing flashings at walls and curbs.Dispose of all materials properly off-site In contractor supplied dumpsters. Existing abandoned roof equipment curbs can remain. Provide no less than %" aluminum plate over any deck penetrations. There are 3 known deck disruptions. Plate shall be sized to go at least 6" beyond any deck fracture. Install tapered Iso board insulation, fully adhered over the existing gypsum deck. To limit the penetrations into the gypsum deck, utilize Firestone Twin Jet, 2-part, low rise, foam adhesive to install the insulation board. Install a self-adhered base sheet over the tapered Insulation. Install (1) ply of Firestone APP 160 smooth Interply - torch applied. Install (1) ply of Firestone APP 180FR - torch applied. There are two existing roofs exhaust fans that are to be raised and re-flashed per Firestone requirements. Power disconnect and reconnect shall be part of this bid. An approved lightning protection system shall be reinstalled as part of this bid.One additional 2,x3' walk pad shall be installed at the roof hatch exit. The existing roof hatch shall be reused and raised as part of this bid if required by Firestone. Supply and install a new metal hatchway guardrail system. Re-install the existing antenna. Properly flash and reroof over existing abandoned equipment roof curbs. Existing 3 roof drains shall be replaced and reutilized in the drain plan of the tapered insulation. The one hose bibb penetration shall remain and receive a Firestone approved detail. There is one section of roof along the west side that the cap sheet is contiguous to the lower roof plain. Confirm with Firestone the dimension needed to roll down the existing west wall, with the new cap sheet.
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents