Similar Projects
Job Order Contract for Concrete Pavement Repair
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value

Parks Asphalt Paving
Infrastructure
Post-Bid
Foristell, MO 63348

Asphalt Removal and Replacement
Infrastructure
Post-Bid
Cottleville, MO

Pavement Sealing and Striping of Justice Center and Water Treatment Facilities Parking Lots
Results
Saint Peters, MO

Great Oaks Turn Lane Addition
Infrastructure
Results
Wentzville, MO

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Bidding
$100,000 to $250,000 est. value

Implementing Traffic Control Signaling Devices and Roadway Improvements
Infrastructure, Alteration
Post-Bid
Wentzville, MO

Hanley Road Reconstruction and Improvements
Infrastructure
Results
Dardenne Prairie, MO

Job Order Contract for Concrete Pavement Repair
Infrastructure
Bidding
$250,000 to $500,000 est. value

Muegge Road
New Construction, Infrastructure
Post-Bid
Saint Charles, MO 63302

2021 Partial Depth Repairs
Infrastructure
Results
Saint Peters, MO

Crack Filling
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Main Street Improvements (Oak Street to Saint Charles Street)
Infrastructure
Results
Cottleville, MO

Last Updated 03/18/2022 09:07 AM
Project Title

Asphalt Overlay 2022

Physical Address View project details and contacts
City, State (County) Saint Charles, MO   (Saint Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project shall include all work incidental to the supply and laying of approximately 9,910 tons of Type "BP-1" and 9,892 tons of Type “BP-2” asphaltic concrete materials, to be paid for by the ton. Full width milling and milling at marked driveways and subdivision entrances of approximately 56,813 square yards of 1.5” to 2” mill and 80,006 square yards of 1” mill that will be paid by the square yard, and removal and replacement of 5,080 lineal feet of 3” rolled curb and gutter will be paid by the lineal foot. For asphaltic concrete overlay work, milling and concrete curb and gutter replacement on various County roads.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Asphalt Curbs, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents