Similar Projects
Eckert Ditch Restoration
Post-Bid
Less than $375,430 est. value
Akron, OH 44308

Jacking and Boring Services
Post-Bid

Culvert Replacement - /Tru Culverts Fy2020
Results

Glacier's Edge Stream and Wetland Restoration Project
Results
Less than $245,621 est. value
Fairlawn, OH 44333

Culvert Cleanout Services
Infrastructure
Post-Bid
Akron, Ashland, Bowling Green, Chillicothe, Delaware, Garfield Heights, Jacksontown, Lebanon, Lima, Marietta, New Philadelphia, Sidney, OH

Miscellaneous Storm Sewer Projects in 2020 and Treeside Drive Culvert Invert Replacement
Results
$137,565 est. value
Stow, OH 44224

UPC North 2020
Results
$113,650 est. value

SUM-Bath Road Landslide Repair
Results
Less than $1,600,312 est. value
Akron, OH 44308

West Bath Road Drainage Improvements
Results
$183,735 est. value
Cuyahoga Falls, OH 44221

Reventment Bags and Erosion Control Mats
Results

Culvert Invert Paving
Term Contract
Results

2020 Catch Basin Repair Project
Results
Sagamore Hills, OH 44067

Our Lady of Guadalupe Detention Basin
Results
$605,000 est. value
Macedonia, OH 44056

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Results

Concrete Pipes
Term Contract
Results

Last Updated 10/20/2021 10:12 AM
Project Title

Herrick Circle Pond Improvements

Physical Address View project details and contacts
City, State (County) Hudson, OH 44236   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $46,191
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work consists of the installation of a new 12” diameter outlet pipe and grading improvements to allow for better maintenance and less flooding of an existing storm water detention pond located northeast of Herrick Circle in the City of Hudson, Ohio.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents