Similar Projects
64th Avenue Reinforced Concrete Box Culvert Fabrication
Post-Bid
Denver, CO

R3 Culvert Lining
Post-Bid
Denver, CO 80204

General Storm Crestone Peak
Results
$2,000,000 to $2,450,000 est. value
Denver, CO

NWC Animal Health Building Soils Remediation
Results
Less than $2,214,000 est. value
Denver, CO 80216

Filing 34 Central Park Station Plaza
Infrastructure
Post-Bid
Denver, CO

Wq Reg High Line Canal (Construction)
Results
$1,050,000 to $1,300,000 est. value
Denver, CO

Ft Morgan Poe Scale Pit Drain
Infrastructure
Post-Bid
$30,000 est. value
Denver, CO

Culvert Repair
Results
Denver, CO 80204

Construction of Filing 40th Avenue Extension
Infrastructure
Post-Bid
Denver, CO 80238

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

Storm/Sewer Ejector Pump Upgrade
Infrastructure
Post-Bid
CO

East 16th Avenue System, Phase 1
Results
$8,500,000 to $9,400,000 est. value
Denver, CO 80202

Las Animas SFU Pond Liner Replacement
Infrastructure
Post-Bid
Denver, CO

27th Street Storm Interceptor - Phase 3
Results
$4,700,000 to $5,200,000 est. value
Denver, CO 80014

Grays Peak General Storm
Results
$4,400,000 to $4,800,000 est. value
Denver, CO

Last Updated 11/30/2021 12:31 PM
Project Title

Heron Pond - Carpio Sanguinette Park, A and B

Physical Address View project details and contacts
City, State (County) Denver, CO   (Denver County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,000,000 to $340,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Civil construction of a new regional water quality facility and future neighborhood park on the 52nd and Emerson property. Infrastructure includes pond grading with outlet structures, two forebays, a trash vault, as well as storm, water, and sanitary improvements. Schedule B (202160372): 3-year maintenance within the site. Estimated Construction Cost: Schedule A: Between $16,000,000.00 and $17,200,000.00; Schedule B: Between $310,000.00 and $340,500.00. Schedule A: 13%; Schedule B: 14%.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents