Similar Projects
Schoenherr Road Warehouse - Speculative Building
New Construction, Demolition - 19,600 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Warren, MI 48089

Bearing Service Warehouse
Addition - 5,000 SF
Design
$400,000 est. value
Warren, MI 48091

Centerwood Drive - Building Addition
Addition - 750 SF
Design
$150,000 est. value
Warren, MI 48091

District Wide Security Upgrades, Paving Projects and Chiller
Post-Bid
Clinton Township, MI 48038

Eastpointe Memorial Library Air Handling Unit Replacement
Post-Bid
Eastpointe, MI 48021

DPW Storage Building Project
Results
Less than $564,138 est. value
Saint Clair Shores, MI

Roseville - Mechanical Renovations - BP07
Results
Roseville, MI

Amazon Logistics - Last Mile Delivery Center
Renovation - 576,000 SF
Construction
Sterling Heights, MI 48310

Mini-Storage with Office
New Construction - 47,964 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Chesterfield Township, MI 48051

LeCom Inc. - New Headquarters and Warehouse
New Construction
Pending Verification
Warren, MI 48092

Recirculating Air in Test Cells at Detroit Arsenal, Warren, MI
Post-Bid
$1,000,000 to $5,000,000 est. value
Warren, MI

New Vehicle Maintenance Facility – Building Fit Out
Results
Mount Clemens, MI

Public Storage
Renovation - 67,280 SF
Post-Bid
Warren, MI

SJ Data Center Cooling Upgrades
Results
Clinton Township, MI

MERV-13 Filters
Post-Bid
Warren, MI 48089

Last Updated 10/02/2020 09:43 AM
Project Title

Food Warehouse Freezer Addition and Renovations Project

Physical Address View project details and contacts
City, State (County) Clinton Township, MI   (Macomb County)
Category(s) Commercial, Single Trades
Sub-Category(s) HVAC, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of all necessary prep to perform work in the Food Warehouse Building as follows: A.Installation of foundation system with associate sitework and alteration of existing truckwells, removal of existing OH doors, etc. as required to install the new outdoor freezer. B.Installation of new roof top condensing units 1.Structural steel work with the new condensing units is included. 2.Associated roof work associated with installation of the new condensing units(sawcutting/removal of BUR and metal deck for connections and walkway padinstallation. Patching of BUR where old condensing units associated with theexisting cooler scheduled for demolition are removed. 3.Painting of all new steel and touch up of existing steel associated with supportof the new condensing units. C.Removal of the existing walk-in cooler and a new expanded walk-in cooler. 1.Relocation of existing power and technology for workstations relocated due to thenew expanded cooler. 2.Removal and re-installation of existing steel guardrail with new concrete filled steelbollards, with prep and repainting of existing guardrail and painting of new bollards. 3.Associated mechanical and electrical alterations to the expanded walk-in cooler asrequired including revisions to the existing fire suppression system. D.Freezer and cooler will be supplied by others for installation under this contract. E.Installation of a new generator.

Details

Warehouse/Storage, 1,325 SF Addition, Renovation.
Division 11 - Equipment, Foodservice Storage Equipment, Walk-In Freezers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents