Similar Projects
Snowshoe and Toboggan Waterline Project
Infrastructure
Bidding
Brian Head, UT

Heritage Park Utility Pipelines
Infrastructure
Bidding

Meter Installation
Post-Bid
Loa, UT 84747

Vowles Minor Subdivision Lateral Improvement Project
Post-Bid
Tooele, UT 84074

Wild Creek and River Oaks Waterline Project
Results
Sandy, UT 84070

Newton Lateral Piping Project - Materials
Results
Newton, UT 84338

Loop Line Evaluation And Lining Project
Infrastructure
Bidding
Vernal, UT

Roosevelt Student Center Hydronic System
Post-Bid
Logan, UT 84322

2020 2000 South Utility
Results
$2,200,000 to $2,400,000 est. value
Orem, UT 84057

Little Cottonwood Penstock Lining Repair
Post-Bid
Murray, UT 84107

8" Waterline Improvement Project on 1100 South
Results
Less than $420,000 est. value
Clearfield, UT 84015

River Bottom Improvement Project Prequalification
Post-Bid

Centennial Way Waterline Replacement Project
Results
North Salt Lake, UT 84054

Gerber Water Line Gerber Spring to Gerber Tank
Post-Bid
Midway, UT

Waterline Improvement Project on State Street (SR-126) from 700 South (SR-193) to 1450 South
Results
Less than $985,000 est. value
Clearfield, UT 84015

Reported 12/18/2021 12:00 AM
Project Title

Loop Line Evaluation and Lining Project 2022

Physical Address View project details and contacts
City, State (County) Vernal, UT   (Uintah County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Two work tasks associated with the loop line drinking water supply line northwest of Vernal Utah in the Dry Fork Area. AVWSID operates this loop line as the main drinking water supply line to Ashley Valley and all of the customers on the drinking water system in this area. The two work tasks are as follows: 1. Evaluation of the existing pipeline (approximately 35,000 feet of 18” to 24” pipeline, variety of materials, sections broken into different bid items) 2. Lining up to three sections of the loop line, two of which cross under Ashley Creek and one that is in an area that is challenging to access.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents