Similar Projects
East West Connector Roadway Safety Improvements - 2-217 - City of Smyrna
Infrastructure
Conception
$2,170,000 est. value
Smyrna, GA 30082

Windy Hill Parkway Improvements - 2-218 - City of Smyrna
Infrastructure
Conception
$1,230,000 est. value
Smyrna, GA 30080

South Cobb Drive Convenience Store
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Marietta, GA 30060

St. Benedict Episcopal School Middle School Classroom Building
New Construction, Infrastructure - 50,000 SF
Design
$7,000,000 CJ est. value
Smyrna, GA 30080

RFP D/B - Design and Installation of New Signage for CobbLinc
Infrastructure
Post-Bid
$200,000 CJ est. value
Marietta, GA 30060

T32-D7-PCC-I285 MP3 to 17.5-130379
Infrastructure
Post-Bid

Florence Road at CH James Parkway
Infrastructure
Results
Powder Springs, GA

2022 Lmig Resurfacing
Infrastructure
Results
$1,039,977 est. value
Marietta, GA

Candlewood Suites
New Construction - 48,850 SF
Construction
$5,000,000 est. value
Smyrna, GA 30080

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Construction
$48,000,000 CJ est. value
Powder Springs, GA 30127

Space Shop Self Storage / Marietta
Addition, Demolition, Renovation, Infrastructure - 33,800 SF
Pending Verification
$20,000,000 CJ est. value
Marietta, GA 30066

Better Baseball Two
New Construction, Infrastructure - 15,000 SF
Pending Verification
$2,500,000 CJ est. value
Marietta, GA 30060

Greers Chapel Road Retail Development
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Kennesaw, GA 30152

Noonday Creek Trail Extension FM SR 92 to Noonday Creek Park
Infrastructure
Design
$5,000,000 CJ est. value
Kennesaw, GA 30144

T32-D7-PCC-I75 NB-SB-MP267-MP270 - 130430
Infrastructure
Post-Bid
GA

Last Updated 05/31/2023 01:14 PM
Project Title

Comfort Suites / Marietta

Physical Address View project details and contacts
City, State (County) Marietta, GA 30067   (Cobb County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Franchisee
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the construction of a wood-framed hotel. This project is on hold. Construction documents are expected to be completed late July / early August 2023. Construction is expected to begin fall 2023.

Details

5 Stories Above Grade, Parking Spaces, 99 Parking Spaces.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents