Similar Projects
Lake One Trail System
Results
Less than $367,879 est. value
TX

Construction of the Katy Pointe Recreation Center
Results
Less than $400,000 est. value
Katy, TX

Vanbrooke Recreation Site
New Construction
Construction
$2,000,000 est. value
Fulshear, TX 77423

Landscape Improvements Phase Two
Post-Bid
Katy, TX

New Pavilion Artesian Park
Post-Bid
Orchard, TX 77464

Lake Two Park Enhancements
Results
TX

Old Hickory Park
Results
Katy, TX 77449

Bundy Lake Park Improvements Phase Two
Post-Bid
Katy, TX 77449

Construction of Cane Island Parkway Phase 2 from FM 1463 to IH 10 for Fort Bend County Bond Project
Results
Less than $4,664,105 est. value
Richmond, TX 77469

Design/Build for South Post Oak Football Field for Fort Bend County
Results
Richmond, TX

Construction Management Services for Westpark Park and Ride
Results
TX

Construction of the City`s Skatepark
Results
$280,000 est. value
Missouri City, TX

Grayson Woods Phase 1 - Hardscape
Results
Katy, TX 77449

Improvements to American Legion Park
Post-Bid
Missouri City, TX 77489

Synthetic Turf Sports Fields and Tracks
Post-Bid
Rosenberg, TX

Last Updated 05/08/2019 09:17 AM
Project Title

Construction of Playground at Waterside Village

Physical Address View project details and contacts
City, State (County) TX   (Fort Bend County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $315,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project includes excavation for the playground pad and pavilion foundation, installation of the pavilion's reinforced concrete foundation, two (2) side-walk extensions to the pavilion,connections to the existing sidewalk, removing and replacing sections of the existing sidewalk, removing four (4)trees, relocating a wrought iron fence, the installation of a drainage system, and the installation of a water fountain including a waterline extension and sump pit. The project includes managing and coordinating with the playground vendor and installer.
Details
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents