Similar Projects
2021 Yard Piping Improvements Bioreactors
Results
Less than $100,000 est. value
West Jordan, UT 84084

Water Reclamation Facility 2021 Upgrades Project
Renovation
Post-Bid
Tooele, UT

Wastewater Treatment Plant Expansion Construction Management/General Contractor Services
New Construction
Post-Bid
$23,000,000 est. value
Payson, UT 84651

2020 Wastewater Improvements
Results
Less than $310,000 est. value
Manti, UT 84642

Dryer Product Piping Replacement
Post-Bid
West Jordan, UT 84084

Equipment for Toole Water Reclamation Facility Filter Upgrade and Expansion
Renovation
Post-Bid
Erda, Tooele, UT 84074

Plant Influent Bypass Pumping, Piping, and Operations
Renovation
Results
Syracuse, UT 84075

New Water Reclamation Facility (WRF) - SW1 Influent Pump Station
Renovation
Post-Bid
Salt Lake City, UT

New Water Reclamation Facility Project SW-2 Standby Power and Susbstation
New Construction, Infrastructure, Alteration
Post-Bid
Salt Lake City, UT 84116

Final Effluent Pipeline Project
Results
Syracuse, UT

Wastewater Treatment Plant 2020 General Upgrades
Results
Springville, UT

Installation of Primary Clarifier 3 Launder, Weirs, Baffles, and Scum Box
New Construction
Results
Syracuse, UT

Construction of the Water Treatment Plant Chain and Flight and Wastewater Treatment Plant Nutrient Upgrades Project
New Construction
Results
Price, UT

Last Updated 03/02/2022 10:05 AM
Project Title

New Water Reclamation Facility

Physical Address View project details and contacts
City, State (County) Spanish Fork, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $80,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The CM/GC Work consists of Two Phases: A Pre-Construction (Design) Phase, and a Construction Phase. Additional information about these phases is provided below. Initially, the CM/GC shall enter into an agreement for Pre-Construction Services with the City. The CM/GC will not be allowed to proceed into construction unless the City agrees that the price provided, as part of a guarantee to complete the project, or a portion of the project, (and independently evaluated) is fair, reasonable and defendable. Upon agreement with the guaranteed maximum price (GMP), the City Council will authorize the City to enter into an Agreement to proceed with Construction Phase Services .

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents