Similar Projects
Red Hill Water Treatment Plant - Upgrades - Rivanna Water and Sewer Authority
Renovation
Conception
$375,000 est. value
VA

South Rivanna Water Treatment Plant Improvements - Rivanna Water and Sewer Authority
Renovation, Infrastructure
Conception
Less than $2,800,000 est. value
Charlottesville, VA 22901

USDA-FS George Washington and Jefferson National Forest Bolar Mountain Waste Water Treatment Upgrade
Post-Bid
Hot Springs, Warm Springs, VA 24484

BHTP Transmission Force Main Section 1 - Subaqueous Portion
New Construction
Post-Bid
Virginia Beach, VA

Digester Upgrade and Rehabilitation Phase 1
Results
Roanoke, VA

Water Treatment Services
Results
VA

Nansemond Treatment Plant Advanced Nutrient Reduction Improvements Phase II(NP013820)
New Construction
Post-Bid
Suffolk, VA 23435

Nansemond Treatment Plant Struvite Recovery Facility Improvements (NP013700)
Renovation - 36,591 SF
Results
Less than $710,000 est. value
Suffolk, Virginia Beach, VA 23435

Water Treatment Plant (WTP) Lagoon Liner Replacement
Renovation
Post-Bid
est. value
Scottsville, VA 24590

Moores Bridges WTP Chemical and Facility Upgrades
Renovation - 6,091 SF
Results
Norfolk, VA

DBP Improvements and Water Treatment Plant Upgrades Project - Contract III: Water Treatment Plant (WTP)
Renovation
Post-Bid
$750,000 to $1,000,000 est. value
Richlands, VA

Installation of New Water Distribution System/Wastewater Treatment Plant City and Plant Water Improvements
Renovation
Results
$60,000 est. value
Richmond, VA 23224

Lagoon Floating Mixers
Infrastructure
Post-Bid
Chesterfield, VA

Richmond Water Treatment Plant Raw Water Screening Facilities Project
New Construction
Results
$7,500,000 est. value
Richmond, VA

Dewatering Belt Filter Press - Onancock Treatment Plant (OTP)
Renovation
Post-Bid
Onancock, VA 23417

Last Updated 07/13/2022 09:15 AM
Project Title

Primary and Secondary Sustaining Project 1

Physical Address View project details and contacts
City, State (County) Lorton, VA 22079   (Fairfax County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $71,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes but is not limited to: Rehabilitation of Primary Settling Tanks Rehabilitation of Activated Sludge Tanks Rehabilitation of Blower Buildings Rehabilitation of Secondary Clarifiers Rehabilitation of Equalization Basins Install Waste Tank and associated pumps Install Flexible BNR Pilot Train All site work, electrical, structural, architectural, and mechanical work

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents