Similar Projects
Watershed Pointe / Divide Highway
New Construction, Infrastructure
Conception
$11,700,000 CJ est. value
Little Rock, AR 72212

The Lofts at Kanis Creek
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Little Rock, AR 72223

Contractor - John L. McClellan (JLM) Memorial Veterans Hospital | RAD Room Site Prep, Room 10
Renovation, Infrastructure
Design
$25,000 to $100,000 est. value
Little Rock, AR 72205

Interstate Battery / Sherwood
Addition, Infrastructure - 3,596 SF
Design
$900,000 CJ est. value
Sherwood, AR 72120

RFQ Design - C1LZ--Design Parking Garage at JLM - Fisher House Impact Project 598-430 - Little Rock, AR
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Little Rock, AR 72205

Broadway Area Pipe Bursting 2023 Collection System Renewal
Infrastructure
Bidding
$500,000 CJ est. value
North Little Rock, AR 72114

Convert Mission Planning Cell B-380
Addition, Demolition, Build-out, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
LrAFB, AR 72099

Wellington Hills Apartments
New Construction, Infrastructure - 56,482 SF
Post-Bid
$85,000,000 CJ est. value
Little Rock, AR 72201

Fourche Creek Water Reclamation Facility Fog Receiving Station and Digester Upgrades
Renovation
Results
Little Rock, AR 72206

LIT Vortac Relocation Access Drive and Site Grading (Harris Road)
Infrastructure
Results
Little Rock, AR 72223

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

Tulip Farms 16 Inch Main Extension Project
Infrastructure
Construction
$803,104 CJ est. value
Little Rock, AR 72201

River City Hydraulics - Lantrip Road
New Construction, Infrastructure - 8,750 SF
Pending Verification
$2,300,000 CJ est. value
Sherwood, AR 72120

Maverick Addition
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
North Little Rock, AR 72117

Hamilton Apartments
New Construction, Infrastructure
Conception
$90,000,000 CJ est. value
Little Rock, AR 72201

Last Updated 06/07/2023 12:39 PM
Project Title

Santa Clara Creek WRRF

Physical Address View project details and contacts
City, State (County) North Little Rock, AR 72114   (Pulaski County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Supplier’s responsibilities consist of furnishing equipment and services for a complete MBR wastewater treatment system as identified in this section. The Santa Clara Creek WRRF will be built in multiple phases. This RFP is for the supply of MBR equipment and services for Phase 1 only. The Phase 1 design of the MBR system shall include provisions to facilitate the expansion to Phase. The Phase 1 project will include the construction of concrete basins for three bioreactor treatment trains (herein referred to as reactors), using common wall construction. At the end of the three reactors, a minimum of four MBR basins shall be constructed. In Phase 1, two reactors shall be outfitted for MBR operations while the third reactor remains empty to act as an equalization basin. Additionally, three MBR basins shall be outfitted with MBR units (membranes), with some spare space in each MBR basin for future MBR units’ installation. The fourth MBR basin will remain empty.The selected Supplier will be responsible for furnishing all equipment and services required for the Phase 1 MBR treatment system. This does not include installation, concrete, electrical wiring and conduits, liquid piping, air piping, or basic manual gates. The Supplier is responsible to provide instrumentation, specialty valves and motorized actuators, control panels, and programming with their system. Additionally, the Supplier is responsible to provide in-basin permeate piping, air piping, and related equipment, hardware, and supports. The Supplier is also responsible for assisting the General Contractor with any questions and incompatibilities that arise during installation of supplied equipment. The Supplier is responsible for overseeing the initial installation of equipment and all testing and start-up procedures, including but not limited to training Owner’s operations staff on the proper operation and maintenance of the equipment and providing O&M manuals for all equipment supplied.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents