Similar Projects
Blatt Building - Window Replacement
Bidding
$950,000 to $1,000,000 est. value
Columbia, SC

Gressette Building - Window Replacement
Bidding
$1,250,000 to $1,450,000 est. value
Columbia, SC

Jarret Building - Window Sill/Building Envelope Waterproofing
Post-Bid
$175,000 to $190,000 est. value
Columbia, SC 29201

SCDHHS Demo/Replace Glass Doors J1
Post-Bid
Columbia, SC 29201

Walden Window Replacement
Results
$14,015 est. value
Columbia, SC

Overhead Door/Rollup Gate Preventative Maintenance
Results
SC

Seal Windows at Bates House on The Columbia Campus
Post-Bid
Columbia, SC 29208

Exterior Door Replacement
Results
Columbia, SC 29223

Overhead Door Maintenance IDIQ
Post-Bid
Columbia, SC 29207

DeSaussure E and G Window Replacement Project
Results
$225,000 to $350,000 est. value
Columbia, SC 29208

Window Frame and Glass Replacement and Repair
Post-Bid
SC

Wood Doors
Results
Columbia, SC 29210

Richland Library Operations Center Window Replacement
Post-Bid
$17,000 to $23,000 est. value
Columbia, SC 29201

Energy Savings Performance Services
Term Contract
Results
Columbia, Eastover, Hopkins, SC 29209

Vertical Stiffener/Doors
Post-Bid
Columbia, SC 29210

Last Updated 06/13/2019 11:56 AM
Project Title

Airport Hangar Door and Gasket Replacement

Physical Address View project details and contacts
City, State (County) Columbia, SC 29205   (Richland County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Northwest Hangar Complex includes the following: Hangar Building 'A' - 18 nested T-Hangars with bifold door widths of 41 feet. Hangar Building 'B' - 18 nested T-Hangars with bifold door widths of 41 feet. Hangar Building 'C' - 15 nested T-Hangars with bifold door widths of 41 feet and two (02) small corporate hangars with bifold door widths of 47.5 feet. Hangar Building 'D' - Seven (7) medium corporate hangars with bifold door widths of 64.5 feet. The Southeast Hangar Complex includes the following: Hangar Building 'F' - 17 nested T-Hangars with sliding door heights of - 13 feet. Hangar Building 'G' - 18 nested T-Hangars with sliding door heights of - 13 feet. Maintenance Hangar includes the following: Hangar Building 'E' - two sets of four-panel sliding doors heights of - 30 feet. Replacement of the door gaskets only.
Details
Division 08 - Openings, Doors and Frames, Windows.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents