Similar Projects
Secondary Water Filter Modifications
Bidding
Payson, UT 84651

Mapleton City Street Rehabilitation Project 2021
Bidding
Mapleton, UT

Culinary Water Improvements
Post-Bid
Less than $700,000 est. value
Levan, UT 84639

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Z--Dino - Design/Build, Replace Water Line
Results
$500,000 to $1,000,000 est. value
Jensen, UT 84035

Bryner Ploutz Pipeline
Results
$50,000 to $100,000 est. value
Helper, UT 55101

Excavation and Water System Repair Services
Term Contract
Post-Bid
Park City, UT 84060

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

2020 Water Line Projects
Post-Bid
Midway, UT 84049

Decommissioning Water Systems
Results
$50,000 to $100,000 est. value
Price, UT 84501

Water Line Pipe and Fittings
Post-Bid
Provo, UT

Dixie Springs Phase I Water System Replacement
Results
Less than $1,000,000 est. value
Hurricane, UT 84737

Clearfield City 10-Inch Waterline Improvement Project on 1000 East Street
Post-Bid
$176,800 est. value
Clearfield, UT 84015

SVW and SID Culinary Water Improvements Project 2019
Results
Less than $2,251,221 est. value
Moab, UT

Construction of the Wallsburg Town - CDBG Spring Transmission Line Improvements Project
Post-Bid
Heber, UT 84082

Reported 03/17/2021 12:00 AM
Project Title

River Bottom Improvement Project Prequalification

Physical Address View project details and contacts
City, State (County) State-Wide: UT
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 6,300-linear feet of Cured-in-Place Pipe (CIPP) within an existing 42-54-inch sewer trunk line located in various locations along the Jordan River between 9000 S and 11400 S • Installation of approximately 1,200-feet of non-linear Cured-in-Place Pipe (CIPP) within two existing crossing structures that cross the Jordan River • Installation of approximately 1,600-linear feet of Cured-in-Place Pipe (CIPP) within an existing 30-inch sewer trunk line located along South Jordan Parkway (10600 S) between River Front Parkway and Baxter Drive • Installation of approximately 3,500-linear feet of Cured-in-Place Pipe (CIPP) within an existing 12-30-inch sewer trunk line located in various location in Bluffdale and Draper • Reconnection of all active laterals to the new pipeline. • Installation of approximately 62 Corrosion Resistant Manhole Liners • Installation and removal of temporary construction access roads • Construction of temporary bypass connections and bypass pipelines • Perform all necessary by-pass pumping and odor control needed to complete the project • Traffic Control permitting and execution during construction • Coordination with Mulligan’s Golf Course to limit closures to their course and driving

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents