Similar Projects
Shoreline Storage Tunnel Project
Bidding
$213,500,000 est. value
Cleveland, OH

Zoar Levee System Repairs, Zoar, OH
Post-Bid
Zoar, OH

Cleveland Bulk Terminal Ore Conveyance Tunnel Extension Project - Phase B
Post-Bid
Cleveland, OH

Western Campus Tunnel Removal and Presser Hall Bridge Rehabilitation
Results
Less than $1,435,000 est. value
Oxford, OH

Lockington Dam Right Wall Drain System and Concrete Repair Project
Results
Less than $2,614,347 est. value
Lockington, OH 45356

Tainter Gate Parallel Shaft Speed Gear
Post-Bid
Delaware, OH 43015

Muskingum River Lock and Dam No. 7 Mcconnelsville Dam Replacement Design/Build
Results
Less than $7,300,000 est. value
McConnelsville, Minerva Park, OH 43229

Youngstown Dam Removals Project
New Construction
Post-Bid
Youngstown, OH

Village of Crooksville Reservoirs No. 1 and No. 2 Dam Breach Project
Results
Less than $250,000 est. value
Crooksville, OH 43731

2020 Pedestrian Tunnel Maintenance
Renovation
Post-Bid
$540,000 est. value
Dublin, OH

Southeast Dam Package - Veto Lake Dam Rehabilitation Project
Results
Less than $3,201,879 est. value
Belpre, OH 45714

Southeast Dam Package - Tycoon Lake Dam Rehabilitation Project
Results
Less than $3,201,879 est. value
Belpre, OH 45714

Hoover Dam Improvements- Part 1
Results
Less than $15,381,250 est. value
Columbus, OH

Statewide Dam Improvements CMAR
Results
Less than $17,930,000 est. value
Celina, Circleville, Lake Milton, Van Buren, OH

Cleveland Bulk Terminal Ore Conveyance Tunnel Permanent Material Design Build Contract
Results
$2,881,518 est. value
Cleveland, OH 44113

Reported 12/24/2020 12:00 AM
Project Title

Lower Olentangy Tunnel

Physical Address View project details and contacts
City, State (County) Columbus, OH 43215   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the construction of approximately 17,000 linear feet of 12-foot minimum diameter sewer via tunnel boring machine through soft-ground, mixed-face conditions and a short section of shale. The project also includes 335 linear feet of 12-foot diameter sewer via sequential excavation through karstic limestone, and approximately 1,075 linear feet of 90-inch combined sewer to be constructed via curved microtunnel through soft-ground.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents