Similar Projects
HVAC Improvements and Upgrades
Post-Bid

ASEC Insulation Project 210002
Post-Bid
Akron, OH

Furnace Replacement and Related Work
Results
Akron, OH 44306

HVAC Maintenance Services
Results

HVAC and Mechanical Products
Term Contract
Post-Bid

Summit County Medical Examiner HVAC Improvements
Results
Less than $805,000 est. value
Akron, OH

HVAC Maintenance - Police Training Facility
Results
Akron, OH 44300

Fire Station No 1 - Installation of a Wet Sprinkler System
Results
Less than $88,000 est. value
Twinsburg, OH 44087

NIFH-Stem HVAC Equipment Pre-Purchase
Results
Less than $275,000 est. value
Akron, OH 44300

Roadway Building Air Handler Replacement
Results
Less than $65,750 est. value
Akron, OH 44300

Chiller Maintenance and Overhaul at the Physical Facilities Operations Center
Results
Akron, OH 44325

HVAC Maintenance for the Juvenile Court Facility
Term Contract
Results
Less than $175,000 est. value
Akron, OH 44308

Summit County CSB HVAC Unit Replacement Project
Results
Less than $225,000 est. value
Akron, OH 44308

Exhaust System to the Existing Welding Lab
Results
$107,525 est. value
Akron, OH 44308

BCI OPOTA Richfield HVAC Upgrades
Results
Less than $1,711,000 est. value
Richfield, OH 44286

Last Updated 05/04/2020 12:07 PM
Project Title

HVAC Maintenance for the Summit County Safety Building

Physical Address View project details and contacts
City, State (County) Akron, OH 44308   (Summit County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $120,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Summit County Safety Building is a seven (7) floor structure with additional underground parking levels. Equipment to be serviced is located in B1 and B2 (parking levels), floors one, two, three, four, six, seven and the penthouse and roof areas. The fifth floor of the building is occupied by the City of Akron and is not included in the agreement. Chilled water for a portion of the building cooling and hot water for the building heating system is supplied by the City of Akron Stubbs Building. Rooftop units supply the remaining cooling and heating requirements. Major pieces of equipment and approximate quantities are identified in the equipment list attached.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents