Similar Projects
PSOC Server Room Cooling Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Lexington, KY 40504

Asset Preservation - Central Heating Deaerator Tank
Renovation
Sub-Bidding
$432,000 CJ est. value
Lexington, KY 40508

Split System and Rooftop A/C Replacement
Alteration
Post-Bid
Louisville, KY 40212

Custom Air Handling Unit
Renovation
Post-Bid
$800,000 CJ est. value
Lexington, KY 40508

UKHC PAV H - Replace AHU S1 and S1A - BP-02 Trades - Trade Package 5 - Fire Suppression
New Construction, Infrastructure
Results
Lexington, KY 40508

PAV WH Replace AHU 4 and 5 - 2553.0
Infrastructure
Results
$1,425,000 est. value
Lexington, KY

Construction to Upgrade Chiller Plant
Renovation
Post-Bid
$5,000,000 CJ est. value
Lexington, KY 40511

Town Branch Scum Facility Improvements
Renovation, Alteration
Results
Lexington, KY 40504

HVAC Repair
Term Contract
Post-Bid
Lexington, KY 40508

Cooling Plant 1 Tower Replacement - Phase III
Alteration
Results
Lexington, KY 40502

Whitaker Family YMCA Swimming Pool HVAC Replacement
Build-out
Post-Bid
$1,500,000 CJ est. value
Lexington, KY 40509

Blue Grass Airport - Boiler Room 1 - Chiller Replacement - 2112
Alteration
Results
$275,000 est. value
Lexington, KY

Chemistry Physics Building - Heat Exchange
Renovation
Post-Bid
Lexington, KY 40508

Fine Arts Building Elevator Modernization
Renovation
Results
Lexington, KY 40508

HVAC York Fan Boxes
Term Contract
Post-Bid
Lexington, KY 40510

Last Updated 03/08/2023 12:55 PM
Project Title

Parking Structure - 8 Rooftop Unit Replacement

Physical Address View project details and contacts
City, State (County) Lexington, KY 40508   (Fayette County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $79,378 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Replace existing rooftop unit on parking structure #8. The time for substantial completion for all phases shall be 30 Calendar Days and Final Completion shall be 30 days thereafter. Substantial Completion will include all site restoration completed, site clean-up and fully functional. All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. Anyone wishing to discuss specific items is requested to submit the items in writing to the Capital Construction Procurement Office, no later than 2/17/2023. Written questions can be submitted by email to: cckbidquestions@uky.edu. SUMMARY A. The scope of work includes all labor, materials, tools, equipment, facilities, transportation and services necessary for, and incidental to performing all operations in connection with protection of existing trees and other plants as shown on the drawings and as specified herein. 1. Provide preconstruction evaluations and Arborist Report. 2. Provide tree and plant protection fencing. 3. Provide protection of root zones and above ground tree parts and plants. 4. Provide pruning of existing trees and plants. 5. Provide all insect and disease control. 6. Provide maintenance of existing trees and plants including irrigation during the construction period as recommended by the Arborist Report. 7. Provide maintenance of existing trees and plants including irrigation during the post construction plant maintenance period. 8. Remove tree protection fencing and other protection from around and under trees and plants. 9. Clean up and disposal of all excess and surplus material.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents