Similar Projects
Callahan Country RV & Water Park
Renovation
Conception
Callahan, FL 32011

Newfield - Master Plan
New Construction - 296,000 SF
Design
$10,000,000 CJ est. value
Palm City, FL 34990

CCSWDC Scale Replacement and Access Improvements
Infrastructure, Alteration
Bidding
$7,318,218 est. value
Sarasota, FL

Lake Lancaster to Lake Davis Drainage Improvement
Infrastructure
Bidding
$915,000 est. value
Orlando, FL 32806

Cordova Palms - Site Only
New Construction
Post-Bid
Saint Augustine, FL

Palm Avenue Improvements - Gary Street To Prudential Drive
New Construction
Post-Bid
Jacksonville, FL 32099

Shore Protection Project (SPP), North Boca Raton Segment, Beach Renourishment 2019, Palm Beach County, Florida
Results
$8,000,000 to $14,000,000 est. value
Palm Beach, FL

Shingle Creek Shoal Removal
Results
Kissimmee, FL 34741

FD LLC Fort Pierce - Site Development
New Construction
Construction
$300,000 est. value
Fort Pierce, FL 34947

The Lofts At Murray Hill - Site
New Construction
Construction
Jacksonville, FL 32205

Sumter Villas
New Construction
Pending Verification
Bushnell, FL

Construction of Plastic Mains Materials and Services
Infrastructure
Bidding
Valparaiso, FL

Construction Services for Project Improvements (Phase 3)
Post-Bid
FL

Shore Protection Project, Anna Maria Island, Beach Renourishment 2020, Manatee County, Florida
Results
$15,000,000 to $25,000,000 est. value
Anna Maria, FL

Sea Breeze Mobile Home and RV Park
New Construction, Build-Out - 25,974 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Islamorada, FL 33036

Last Updated 12/21/2021 02:54 AM
Project Title

Continued Emergency Discharge Response and Contaminated Area Excavation/Interim Source Removal

Physical Address View project details and contacts
City, State (County) Key West, FL 33040   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of personnel and equipment to (1) maintain a boomed and completely contained area waterward of the discharge (outer boom tiers approximately 600 and 300 feet long, inner boom tiers each approximately 250 feet long) and augment as necessary to ensure sheen is not present outside the inner booms; (2) skim surface waters within boom to recover discharged product during periods near low tide; (3) absorb the discharge from the waterward containment area as necessary throughout the work period; (4) skim or by other methods remove product which migrates or is found within the upland Excavation Area during and after excavation is complete; (5) contain recovered free product and petroleum contaminated water (PCW) prior to hauling/disposal; (6) dispose of product and PCW recovered from the seaward containment area and upland Excavation Area; and (7) load, transport and dispose of contaminated soil originating from within the upland Excavation Area

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents