Similar Projects
Pulpit Rock Inn
New Construction - 34,685 SF
Conception
Warwick, NY 10990

Culinary Check In-Institute
New Construction
Conception
$98,000,000 est. value
Hyde Park, NY 12538

Elmwood Preserve Senior Housing
New Construction
Design
Greenburgh, NY 10607

Mamaroneck Avenue Apartments
New Construction - 2,101 SF
Design
$100,000,000 to $125,000,000 est. value
White Plains, NY 10605

Municipal Pool Repairs
Bidding
Chateaugay, NY 12920

Installation of New PVC Pool Membranes at Highland Park and West Endicott Park
Post-Bid
Endwell, NY 13760

Andretta Pool House, Phase 1B - Pool Upgrades
Term Contract
Post-Bid
Kingston, NY 12401

2016 Capital Project - Middle School Pool
Results
$1,000,000 to $2,000,000 est. value
Delmar, NY 12054

Elm Avenue Park – Outdoor Pool Complex Dive/Slide Pool Construction
Results
$650,000 to $950,000 est. value
Delmar, NY 12054

42 Broad Street West - Fleetwood
New Construction - 354,000 SF
Construction
$95,000,000 est. value
Mount Vernon, NY 10550

Watermark Pointe
New Construction
Construction
$100,000,000 est. value
New Rochelle, NY 10801

Halfmoon Heights Community Center
New Construction - 2,200 SF
Pending Verification
Clifton Park, NY 12065

Liberty Mixed Use
New Construction, Renovation, Addition
Pending Verification
Liberty, NY 12574

Highview II Milton Street Residential
New Construction
Conception
Poughkeepsie, NY 12601

South Broadway Hotel
New Construction
Design
Saratoga Springs, NY 12866

Reported 11/08/2019 12:00 AM
Project Title

High School Pool Project

Physical Address View project details and contacts
City, State (County) Corning, NY 14830   (Steuben County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,200,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

General Trades Work HVAC Work Electrical Work Plumbing Work Roofing Work Pool Plumbing Work Performance Sound Work

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents