Similar Projects
Buckeye Brook Restoration Project
Infrastructure
Bidding
Warwick, RI 02886

Street Paving Services
Infrastructure
Bidding
$500,000 est. value
South Kingstown, RI

Supply of Drainage Pipe
Post-Bid
Woonsocket, RI

High Density Polypropylene Pipe
Term Contract
Post-Bid
Warwick, RI

F--Drilling Svcs in Massachusetts and Rhode Island
Results

F--Drilling Svcs in Massachusetts and Rhode Island
Results

Irving Avenue Stormwater Management and Riverbank Restoration
Infrastructure
Bidding
$100,000 est. value
Providence, RI 02906

Retaining Wall Replacement
Infrastructure
Post-Bid
Woonsocket, RI

Drilling IDIQ in Massachusetts and Rhode Island
Results

Prete-Metcalf Field Drainage Improvements
Infrastructure
Bidding
$200,000 est. value
Providence, RI 02904

Sidewalk, Road, and Drainage Construction
Infrastructure
Post-Bid
Central Falls, RI

Installation of Drainage City Wide
Term Contract
Results
Woonsocket, RI

NAVFAC Bulkhead Repairs, S45N
Alteration
Post-Bid
$5,000,000 to $10,000,000 est. value
Newport, RI

Route 1 Post Road Drainage
Results
North Kingstown, RI 02852

Frames, Grates, and Covers
Term Contract
Post-Bid
Warwick, RI

Reported 04/21/2022 12:00 AM
Project Title

Fox Hill Avenue Drainage Improvements Project

Physical Address View project details and contacts
City, State (County) Bristol, RI 02809   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work in this Contract includes, but is not limited to: Installation of a new closed drainage system including the furnishing and installing of new drainage manhole and catch basin structures, castings, and drainage pipes of multiple types. Modifications to existing utility (storm water and water) pipelines and structures, including (but not limited to) removal or abandonment-in-place, replacement, and relocation of water services and valves. Installation of permanent bituminous trench patch. Removal and replacement of subgrade material with gravel borrow base course material. Temporary flow diversion and/or bypassing of stormwater and flows. Other related civil/site work necessary to complete the project as designed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents