Similar Projects
Last Updated | 05/07/2020 01:02 PM |
Project Title | 2020 Paving Season |
Physical Address | View project details and contacts |
City, State (County) | Dover, VT (Windham County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor will provide rollers, signs and all traffic control. All shim and overlays will be 2 inches. All driveways will have a 2-foot apron. All intersecting roads must make a smooth transition both off and on roads. The contractor must sweep all shimming and overlay work. The materials used for shim and overlay will be 3/8 to 1/2-inch stone. The contractor must use two rollers when paving. Equipment used by the contractor must be approved by the Road. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |