Similar Projects
RFQ D/B - Install Additional Pump on OR Chilled Water Loop
Renovation
Bidding
$250,000 CJ est. value
West Palm Beach, FL 33410

Core Area Neighborhood Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Gulf Stream, FL 33483

Irrigation Services
Term Contract
Sub-Bidding
Sarasota, FL 34237

Ackerman Vacuum Sewer Zones 1 and 2 Plumbing Contract 3
Term Contract
Sub-Bidding
$432,000 CJ est. value
Port Charlotte, FL 33952

RFQ D/B - Design-build Services for Southwest Water Reclamation Facility Second Cloth Media Filter
Renovation
Post-Bid
$4,390,000 CJ est. value
Bradenton, FL 34210

NKB ADA Restroom Renovation A-Wing South Plumbing Stack
Renovation, Alteration - 2,008 SF
Post-Bid
Tallahassee, FL 32399

Plumbing Services
Term Contract
Results
FL

Plumbing Repairs, Services and Parts
Alteration
Results
$300,000 est. value
Brooksville, FL

Plumbing Repairs
Renovation
Sub-Bidding
$315,000 CJ est. value
Ocala, FL 34475

Sunbridge Water Treatment Plant Supply Well No. 3
Term Contract
Post-Bid
$600,000 CJ est. value
Kissimmee, FL 34746

Plumbing Services
Term Contract, Alteration
Results
Tampa, FL 33607

Plumbing Supplies, Annual
Term Contract
Post-Bid
Fort Myers, FL

SWAG 10th Street Stormwater Improvements, PH. 2A
Renovation, Infrastructure
Results
$470,000 est. value
Key Colony Beach, FL 33051

New Water Booster Pump Station Rebid
New Construction, Infrastructure
Post-Bid
$21,475,138 CJ est. value
Nokomis, FL 34275

Nassau Amelia Island Infilration and Inflow Reduction Project
Renovation
Results
$1,496,932 CJ est. value
Yulee, FL 32097

Last Updated 10/06/2023 03:34 AM
Project Title

Drainage Improvements - Miami-dade

Physical Address View project details and contacts
City, State (County) Miami, FL 33132   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Miami-Dade Road Name: Drainage Improvements - Pushbutton Limits: Midpoint Project(s): 44596335201(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 730 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Description: This contract consists of Push-Button Drainage Improvements at various locations. Pre-qualification is required. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Department's estimated quantities and the Contractor's bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. Award will be made at the Department Advertised Estimate amount of $1,000,000.00 For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Question Deadline 11/09/2023 Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. FDOT - Call Order: 001 Drainage Improvements - Miami-Dade

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents