Similar Projects
Hughes Stadium Redevelopment
New Construction
Conception
Fort Collins, CO 80526

Park Hill Golf Course Redevelopment
New Construction
Conception
Denver, CO 80207

Aspen Meadows
New Construction
Design
Colorado Springs, CO

Habitat For Humanity Neighborhood
New Construction
Design
Denver, CO 80014

Construction Management/General Contractor (CM/GC) Services
New Construction
Bidding
Aurora, CO

Construction Management/General Contractor (CM/GC) Services
New Construction
Bidding
Aurora, CO

General Contractor Services - Burlingame Phase III Modular Affordable Housing
Post-Bid
Aspen, CO

1400 South Collyer #301
Post-Bid
Longmont, CO

City of Victor 1st Street Housing Development
Results
Victor, CO

General Contractor and Construction Management Services for Dillon Valley Local Resident Housing
New Construction
Results
Frisco, CO 80443

Hartford Homes at Trailside
New Construction
Construction
Timnath, CO 80547

Rock Canyon Subdivision
New Construction
Construction
$10,000,000 est. value
Colorado Springs, CO 80104

Timbervine
New Construction
Pending Verification
Fort Collins, CO 80524

Minturn North
New Construction
Pending Verification
Minturn, CO

The Village at Loretto Heights
New Construction, Renovation
Conception
Denver, CO 80236

Last Updated 05/27/2021 12:30 PM
Project Title

V07 House Start-Up Renovation - Scpp Contractors Only

Physical Address View project details and contacts
City, State (County) Aurora, CO 80045   (Adams County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $163,217
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The water damage and interior renovation scope includes, but is not limited to: miscellaneous demolition, general carpentry, interior finishes, flooring, ceramic tile, painting, kitchen cabinetry, millwork & trim, along with miscellaneous plumbing and electrical. Project also includes the removal and replacement of existing composition shingle roofing, guttering and downspouts on the exterior.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents