Similar Projects
Last Updated | 01/19/2021 11:05 AM |
Project Title | Construction of Two (2) Highway Maintenance Buildings |
Physical Address | View project details and contacts |
City, State (County) | Bay Minette, Silverhill, AL (Baldwin County) |
Category(s) | Commercial |
Sub-Category(s) | Warehouse/Storage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,928,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of Highway Department Area 100 Maintenance Facility located in Bay Minette, AL The Work consists of the following general scope. The site of the proposed work will be located at 203 Dickman Road, Bay Minette, AL 36507. The existing facility will be demolished for construction of the new facility. Special care will be taken during the demolition process in order to retain and store select existing facility items per the County’s direction. The new 9,600 sf facility consists of approximately 3,600 sf of conditioned office space with mezzanine above, and 6,000 sf of shop and storage space. The Work will include, but is not limited to, a new PreEngineered Metal Building with interior partitions, HVAC, electrical, data, security, and plumbing to support the office and shop layouts, installation of new door and hardware communications back to the County’s access controls system, and interior/exterior finishes as defined within the construction documents. The shop area will also house a service pit, parts storage area, and multiple high bay doors. Estimated Construction Cost: $1,464,000.00 Construction of Highway Department Area 200 Maintenance Facility located in Silverhill, AL The Work consists of the following general scope. The site of the proposed work will be located at HWY 104, Silverhill, AL 36576. The existing facility will remain, and a new facility will be constructed on the adjacent lot. The new 9,600 sf facility consists of approximately 3,600 sf of conditioned office space with mezzanine above, and 6,000 sf of shop and storage space. The Work will include, but is not limited to, a new Pre-Engineered Metal Building with interior partitions, HVAC, electrical, data, security, and plumbing to support the office and shop layouts, installation of new door and hardware communications back to the County’s access controls system, and interior/exterior finishes as defined within the construction documents. The shop area will also house a service pit, parts storage area, and multiple high bay doors. Estimated Construction Cost: $1,464,000.00 |
||||||||||||||||||||||||||||||||||
Details | 2 Warehouse/Storage, 9,600 SF New Construction.
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |