Similar Projects
Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Gisler Avenue Landscape Improvements - City of Costa Mesa
Infrastructure, Alteration
Conception
$350,000 est. value
Costa Mesa, CA 92626

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Anaheim, CA 92801

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Newport Beach Junior Lifeguard Building Project
New Construction, Infrastructure
Bidding
$4,800,000 CJ est. value
Newport Beach, CA 92663

Berry Street Sidewalk
Infrastructure
Bidding
$400,000 CJ est. value
Brea, CA 92821

Install Iron Fence and Modify Landscape and Irrigation Facilities
Infrastructure
Sub-Bidding
$1,870,000 CJ est. value
Tustin, CA 92780

38th Street Park and San Miguel Park Fencing Project
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Newport Beach, CA 92663

Scott Rd, Pittman Lane, And Barton Banks Rd Street Improvements
Alteration
Post-Bid
Irvine, CA 92602

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

Transit Asset Management Plan Update
Alteration
Results
$175,000 est. value
CA

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

West Broadway Townhomes
Demolition, New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Anaheim, CA 92802

Adams Avenue Bicycle Facility - Fairview Road to Harbor Boulevard - City of Costa Mesa
Infrastructure
Conception
$1,500,000 est. value
Costa Mesa, CA 92627

Last Updated 08/04/2022 12:33 AM
Project Title

Carbon Canyon Booster Pump Station No. 3 Rehabilitation

Physical Address View project details and contacts
City, State (County) Brea, CA 92821   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,389,555 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of February 28, 2022, All bids rejected. The Project consists of water system booster pump rehabilitation / reconstruction improvements on Carbon Canyon Booster Pump Station No.3 within the City of Brea. Each bid shall be accompanied by bid security in the form of a cashier's check, certified check or bid bond in the amount of 10% of the total bid amount. All cashier's checks or certified checks must be drawn on a responsible bank doing business in the United States and shall be made payable to THE CITY OF BREA. A bonding companyadmitted and licensed to do business in the State of California must issue bid bonds. Bids not accompanied by the required bid security shall be rejected. Cash and personal or company checks are NOT acceptable. A Payment Bond and a Performance Bond, each in the amount of 100% of the contract amount, will be required of the Contractor Questions regarding this Notice Inviting Bids shall be directed to: Michael Ho, PE, Deputy Director/City Engineer at michaelh@ci.brea.ca.us.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents