Similar Projects
Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

Canal Road Pump Stations No. 2 & No. 3 At Wood River Levee District
Renovation
Design
$1,000,000 to $5,000,000 est. value
Roxana, IL

Phase 3 Water Supply Improvement Project
New Construction
Bidding
$300,000 est. value
Quincy, IL

The Villas Lift Station Rehabilitation Project
Renovation
Bidding
$590,000 est. value
Highland Park, IL

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

Check Valve Replacement
Renovation
Post-Bid
Gurnee, IL 60031

Lakeshore Drive Lift Station Replacement
Results
Decatur, IL 62521

Sugar Creek Pump Station Rehabilitation
Results
Less than $700,000 est. value
East Moline, IL

Kimundy Pump Station - Contract B
New Construction - 23,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Sandoval, IL 62882

High Lift Pump 7 Replacement
Renovation
Post-Bid
Northbrook, IL

Sugar Creek Pump Station Improvements
Results
Less than $10,000 est. value
Bloomington, IL

STP Influent Pumping Station Rehabilitation
Post-Bid
Eldorado, IL

Dawes Elementary Vacuum Pump Station
Renovation
Results
Chicago, IL 60652

York Road (LS-10) and Thomas Foster (LS-15) Lift Station Improvements
Post-Bid
Bensenville, IL 60106

Automatic Transfer Switches North Chicago, Lake Bluff, And Cary Avenue Pump Stations
Renovation
Results
$750,000 est. value
Gurnee, IL

Last Updated 05/19/2022 01:45 PM
Project Title

Summerfield Lift Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Naperville, IL   (DuPage County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed under this Contract consists of the replacement of existing standby generator, automatic transfer switch and associated cables, conduits, control and monitor system. It also includes replacing existing two sewerage pumps, accessories, installation of mixer and upgrading associated control system, installation of new VFDs, SCADA, wires, conduits and a new control enclosure. It also includes installation of new concrete pavement and associated outside earthwork and concrete pads.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents