Similar Projects
New Central Fire Station
New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Springdale, AR 72762

Seal Coating and Re-Striping of the Parking Lot at Arvest Ballpark
Infrastructure
Post-Bid
Springdale, AR 72762

ARWWA Miscellaneous Upgrades 2021
Infrastructure
Post-Bid
Farmington, AR

Prairie Grove and Siloam Springs Overlay
Results
Prairie Grove, Siloam Springs, AR

Richmond Road Surfacing
Infrastructure
Results
Farmington, AR 72730

Viney Grove Road - Phase I improvements
Infrastructure
Post-Bid
Prairie Grove, AR 72753

Construction – 2021 Waterline Improvements
Infrastructure
Results
Less than $5,250,000 est. value
Fayetteville, AR

Construction of the Mission-Razorback Connector
Infrastructure
Post-Bid
Fayetteville, AR

North 40th Street Improvements
Infrastructure
Results
Springdale, AR 72762

I-49 – Benton Co. Line (Sel. Secs.) (S)
Infrastructure
Post-Bid
AR

2021 Springdale Street Overlay
Infrastructure
Results
Less than $850,000 est. value
Springdale, AR

High Performance Cold Mix
Infrastructure
Post-Bid

Y1LB--564-21-2-635-0001 - 564-20-550 LRP Connecting Road
Term Contract
Results
$250,000 to $500,000 est. value
Fayetteville, AR 72703

Construction - Township Pump Station and Waterline
New Construction, Infrastructure
Post-Bid
Fayetteville, AR

Harmon Avenue and Center Street Intersection Improvements
Infrastructure
Results
Fayetteville, AR 72701

Last Updated 07/28/2022 12:02 PM
Project Title

Upper Ramble Early Package

Physical Address View project details and contacts
City, State (County) Fayetteville, AR 72701   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Upper Ramble Early Package consists of street and utility improvements of West Ave. between Spring and Dickson streets and greenway upgrades between Center and Spring Streets. Any questions or RFI's regarding this project can be sent to james.monhollon@nabholz.com by the bid question deadline of June 22nd, 2022, at 12 noon. All bids shall be submitted in accordance with all state, regulatory and licensing requirements, and all requirements of the Construction Manager's Manual. To be considered, bidders must be licensed on day of bid. Nabholz Construction Services and the City of Fayetteville reserve the right to waive irregularities, reject bids, and postpone the award of any Contract for a period of time which shall not exceed beyond ninety (90) days from the bid opening date. Pursuant to Arkansas Code Annotated 22-9-203 Nabholz Construction encourages all qualified small, minority-owned, women-owned, or disadvantaged business enterprises to submit bids for this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents