Similar Projects
Last Updated | 05/02/2023 01:41 PM |
Project Title | Codorus Creek Flood Wall Improvements |
Physical Address | View project details and contacts |
City, State (County) | York, PA 17401 (York County) |
Category(s) | Government/Public, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Military Facility, Shoreline/Erosion/Drainage, Site Development, Storm/Sewers |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected March 2021 |
Bids Due | View project details and contacts |
Estimated Value | $3,227,444 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *Contract Award Date: Mar 05, 2021 Contract Award Number: W912DR21C0008 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 958326188 Contractor Awarded Unique Entity ID (SAM): CFGEJ3N9ZH45 Contractor Awarded Name: MOHAWK VALLEY MATERIALS, INC. Contractor Awarded Address: Rome, NY USA Base and All Options Value (Total Contract Value): $3227444.00 Penn Street Floodwall Replacement Construction Codorus Creek is located in York, Pennsylvania. The existing flood protection wall between Penn Street and Tyler Run along Codorus Creek was constructed in the 1930s and 1940s and is deteriorating at several locations. If left unattended, the wall could fail, resulting in failure of the flood wall system. The U.S. Army Corps of Engineers desires to take the necessary steps to maintain the effectiveness of the flood wall system to protect the land from the one percent probability flood event (100-year flood) by replacing the Penn Street Floodwall. The project is located on the south side of Codorus Creek on the property of the old Schmidt and Ault Paper Company, now owned by York College. The extent of the work will be to construct approximately 600 linear feet of wall extending west from the south abutment of the Penn Street Bridge to the Tyler's Run tributary to Codorus Creek. The work includes demolition of the existing flood wall, construction of a new flood wall, and removal of stream channel sediments and incidental related work. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |