Similar Projects
Highway Improvement Highway:SL 1
Bidding
$1,379,603 est. value
TX

2016 Bond Intersection Safety Improvements Construction II
Bidding
$1,000,000 est. value
Austin, TX 78704

Cold Mix Asphalt and Parking/Road Striping Services
Term Contract
Post-Bid
Austin, TX 78759

El Malino Dr. and Bellemeade Blvd. Pavement Rehabilitation
Post-Bid
Less than $318,249 est. value
Pflugerville, TX 78660

Southern Region Disaster Recovery Support BPA
Results

Miscellaneous Streets Slurry Seal and Fog Seal IDIQ(CIP )
Term Contract
Results
$8,000,000 est. value
Austin, TX

Water, Wastewater, Drainage and Paving Improvements for Bryson Phase 5 Section 1 and Bryson Phase 6, Public Improvement Construction Plans
Bidding
Leander, TX

Provence Phase 1, Section 3A
Post-Bid
Bee Cave, TX 78733

Lazy Nine Municipal Utility District 1B, Sweetwater Section 2, Village Z3
Results
Austin, TX 73301

Independent Environmental Compliance Management Services for 183 North Mobility Project
Bidding
$4,780,000 est. value
Austin, TX 78750

Caughfield Phase Ten Paving, Drainage, Water Wastewater Improvements
Post-Bid
Austin, TX 78728

Asphalt Parking Lot/Roads Construction, Rehabilation and Repair IDIQ(CIP)
Term Contract
Results
Less than $2,000,000 est. value
Austin, TX 78704

Lohman Ford Road Overlay Rehabilitation
Bidding
Lago Vista, TX 78645

183A Phase III Project – Construction Engineering & Inspection Services
Post-Bid
Less than $180,000,000 est. value
Austin, TX 78705

Skidabrasion Texturing
Results
Less than $553,402 est. value
TX

Reported 12/18/2019 12:00 AM
Project Title

Typhoon Texas Water Park Access Modification

Physical Address View project details and contacts
City, State (County) Pflugerville, TX 78660   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes furnishing all labor, material, tools and equipment and performing all work required for the Typhoon Texas Water Park Access Modification which consists of constructing a right-turn deceleration lane, left-turn lane in the median, driveway reconstruction, shared-use path, and signal modifications at the existing signal at FM 685 at Town Center Drive.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents