Similar Projects
Operation Maintenance and Mangement of Water and Wastewater Systems
Term Contract
Post-Bid
Wentworth, NC 27375

Lake Lure Subaqueous Sewer System Replacement - HPDE Manholes
Post-Bid
Lake Lure, NC

2018 Golden LEAF Disaster Recovery Project Contract No. 2 - Sanitary Sewer and Storm Sewer
Results
Parmele, NC

South Main Street and Southern Avenue Stormwater Improvements
Results
$893,000 est. value
Raeford, NC 28361

Water/Sewer Service Installation
New Construction - 4,111 SF
Construction
Spring Lake, NC

2020 Street, Drainage, Water and Sewer Improvements
Post-Bid
$630,000 to $730,000 est. value
Dunn, NC 28334

Duffyfield Community Stormwater Enhancements - Phase 1
Results
Less than $789,920 est. value
New Bern, NC 28563

30 Market St. Sewer Relocation
Post-Bid
$340,000 est. value
Concord, NC

Sewer Jetter
Results
Elizabeth City, NC 27909

810 Desoto Avenue Storm Drainage Improvements
Post-Bid
Kannapolis, NC 28083

Sanitary Sewer And Water Line Rehabilitation 2020
Results
$13,000,000 est. value
Greensboro, NC 27400

Starvalley 7141 Storm Drainage Improvement Project
Post-Bid
$1,899,563 est. value
Charlotte, NC

Catch Basin Top
Results
Greensboro, NC 27402

Repair Drainage BLDG. 4859 CDC Playground 2 & 3
Post-Bid
$100,000 to $250,000 est. value
Cherry Point, NC

Professional Services for the Installation of Private Sewer Service Lateral Connections in the Historic Rogers Road Area
Results
Chapel Hill, NC 27516

Reported 03/16/2022 12:00 AM
Project Title

Hurricane Florence Damage Repairs - Quarry 2 Drainage Basin

Physical Address View project details and contacts
City, State (County) New Bern, NC   (Craven County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project generally involves the repair of previously identified damages within existing stormwater conveyance channels, ditches, pipes, and wetlands. Work includes installation of temporary access, erosion and sediment control, traffic control, backfill of eroded areas, slope regrading, culvert replacement, and stabilization

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents