Last Updated 02/06/2021 03:46 AM
Project Title

The Random On-Call Pavement Marking on Various Interstate and State Routes

Physical Address View project details and contacts
City, State (County) (Benton, Carroll, Chester, Crockett, Decatur, Dyer, Fayette, Gibson, Hardeman, Hardin, Haywood, Henderson, Henry, Lake, Lauderdale, Madison, McNairy, Obion, Shelby, Tipton, Weakley Counties)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project No. 98400-4175-04 (PIN 118305.08) The random on-call pavement marking on various Interstate and State Routes. Project Length - 0.000 miles Project No. 98400-4176-04 (PIN 116889.09) The retracing of pavement markings with spray thermoplastic on various Interstate and State Routes. Project Length - 0.000 miles Total Contract Length - 0.000 miles Completion Time - On or before 6/30/2022 (See Special Provision 108B) 411-12.01 Scoring Shoulders (Continuous) (16in Width) 10.000 l.m. 411-12.02 Scoring Shoulders (Non-Continuous) (16in Width) 10.000 l.m. 411-12.03 Scoring For Rumble Stripe (Noncontinuous) (8in Width) 10.000 l.m. 411-12.04 Scoring For Rumble Stripe (Noncontinuous) (4in Width) 10.000 l.m. 712-01.50 Maintenance Of Traffic 15.000 Each 713-02.34 Delineators (All) 500.000 Each 716-01.11 Raised Pvmt Markers (Bi-Diretional) (1 Color Lens) 625.000 Each 716-01.12 Raised Pvmt Markers (Mono-Directional) (1 Color Lens) 375.000 Each 716-01.13 Raised Pvmt Markers (Bi-Directional) (2 Color Lens) 750.000 Each 716-01.21 Snowplowable Raised Pavement Markers (Bi-Dir) (1 Color) 1,000.000 Each 716-01.22 Snowplowable Raised Pavment Markers (Mono-Dir)(1 Color) 300.000 Each 716-01.23 Snowplowable Raised Pavement Markers (Bi-Dir)(2 Color) 150.000 Each 716-01.40 Remove And Replace Lens On Snowplowable Reflective Marker 300.000 Each 716-02.03 Plastic Pavement Marking (Cross-Walk) 100.000 l.f. 716-02.04 Plastic Pavement Marking(Channelization Striping) 300.000 s.y. 716-02.05 Plastic Pavement Marking (Stop Line) 650.000 l.f. 716-02.06 Plastic Pavement Marking (Turn Lane Arrow) 100.000 Each 716-02.07 Plastic Pavement Marking (24" Barrier Line) 60.000 l.f. 716-02.08 Plastic Pavement Marking (8" Dotted Line) 300.000 l.f. 716-02.09 Plastic Pavement Marking (Longitudinal Cross-Walk) 120.000 l.f. 716-03.01 Plastic Word Pavement Marking (Only) 60.000 Each 716-03.02 Plastic Word Pavement Marking (Rxr) 15.000 Each 716-03.03 Plastic Word Pavement Marking (Stop Ahead) 10.000 Each 716-03.04 Plastic Word Pavement Marking (School) 5.000 Each 716-03.05 Plastic Word Pavement Marking (Bike Lane) 10.000 Each 716-03.06 Plastic Word Pavement Marking (Signal Ahead) 15.000 Each 716-03.07 Plastic Word Pavement Marking (Stop) 10.000 Each 716-03.08 Plastic Word Pavement Marking (Ped-Xing) 3.000 Each 716-04.01 Plastic Pavement Marking (Straight-Turn Arrow) 7.000 Each 716-04.02 Plastic Pavement Marking(Double Turning Arrow) 10.000 Each 716-04.04 Plastic Pavement Marking (Transverse Shoulder) 250.000 l.f. 716-04.05 Plastic Pavement Marking (Straight Arrow) 5.000 Each 716-04.06 Plastic Pavement Marking (Wrong Way Arrow) 10.000 Each p 716-04.07 Plastic Pavement Marking (Exit Only Arrow) 6.000 Each 716-04.08 Plastic Pavement Marking (Option Lane Arrow) 10.000 Each 716-04.09 Plastic Pavement Marking (h.o.v. Diamond) 10.000 Each 716-04.10 Plastic Pavement Marking (Handicap Symbol) 5.000 Each 716-04.12 Plastic Pavement Marking (Yield Line) 100.000 s.f. 716-04.14 Plastic Pavement Marking (Lane Reduction Arrow) 10.000 Each 716-04.15 Plastic Pavement Marking-Bike Symbol/Arrow Shared 10.000 Each 716-05.01 Painted Pavement Marking (4" Line) 30.000 l.m. 716-05.72 Performance Based Retracing Spray Thermo 4in 913.000 l.m. 716-05.73 Performance Based Retracing Spray Thermo 6in 475.000 l.m. 716-05.74 Performance Based Retracing Spray Thermo 8in 20,700.000 l.f. 716-08.01 Removal Of Pavement Marking (Line) 10,000.000 l.f. 716-08.02 Removal Of Pavement Marking (8" Barrier Ine) 500.000 l.f. 716-08.03 Removal Of Pavement Marking (Cross-Walk) 50.000 l.f. 716-08.04 Removal Of Pavement Marking Channelization Striping) 50.000 s.y. 716-08.05 Removal Of Pavement Marking (Stop Line) 180.000 l.f. 716-08.06 Removal Of Pavement Marking (Turn Lane Arrow) 10.000 Each 716-08.07 Removal Of Pavement Marking (Straightturn Arrow) 4.000 Each 716-08.08 Removal Of Pavement Marking (Double Turning Arrow) 2.000 Each 716-08.09 Removal Of Pavement Marking (Dotted Line) 50.000 l.f. 716-08.10 Removal Of Pavement Marking (Transverse Shoulder) 50.000 l.f. 716-08.11 Removal Of Word Pavement Marking (Description) (Only) 5.000 Each 716-08.12 Removal Of Word Pavement Marking (Description) (Stop Ahead) 3.000 Each 716-08.13 Removal Of Word Pavement Marking (Description) (School) 2.000 Each 716-10.50 Preformed Plastic Pavement Marking (Interstate Shield) 30.000 Each 716-12.01 Enhanced Flatline Thermo Pvmt Mrkng (4in Line) 5.000 l.m. 716-12.02 Enhanced Flatline Thermo Pvmt Mrkng (6in Line) 5.000 l.m. 716-12.03 Enhanced Flatline Thermo Pvmt Mrkng (8in Barrier Line) 375.000 l.f. 716-12.04 Enhanced Flatline Thermo Pvmt Mrkng (4in Dotted Line) 375.000 l.f. 716-12.05 Enhanced Flatline Thermo Pvmt Mrkng (6in Dotted Line) 750.000 l.f. 716-12.06 Enhanced Flat Line Thermo (8in Line) 400.000 l.f. 716-12.07 Enhanced Flat Line Thermo (8in Broken Ln) 100.000 l.f. 716-12.08 Enhanced Flat Line Thermo (12in Barrier Line) 100.000 l.f. 716-12.09 Enhanced Flat Line Thermo (12in Line) 100.000 l.f. 716-13.06 Spray Thermo Pvmt Mrkng (40 Mil) (4in Line) 250.000 l.m. 716-13.07 Spray Thermo Pvmt Mrkng (40 Mil) (6in Line) 20.000 l.m. 716-13.08 Spray Thermo Pvmt Mrkng (40 Mil) (8inbarrier Line) 20,000.000 l.f. 716-13.09 Spray Thermo Pvmt Mrkng (40 Mil) (4in Dotted Line) 100.000 l.f. 716-13.10 Spray Thermo Pvmt Mrkng (40 Mil) (6in Dotted Line) 600.000 l.f. 716-50.01 Roadway Cleaning For Pavement Marking 18.000 l.m. 717-01 Mobilization (1) Ls 717-01.03 Mobilization (Per Call-Out) 16.000 Each 717-01.04 Mobilization (Description) (Per Level 1 Callout) 5.000 Each

Details

Division 32 - Exterior Improvements, Paving Specialties, Pavement Markings, Painted Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents