Similar Projects
Wastewater Treatment Plant Construction
New Construction
Design
Sterling, IL

Installation of New Wastewater Screening Equipment in Influent Building of Village of Gilberts Wastewater Treatment Facility
Renovation
Bidding
$528,000 est. value
Gilberts, IL

Wastewater Treatment Plant Improvements
Renovation
Bidding
$180,000 est. value
Ridge Farm, IL

Wastewater Treatment Facility Controls Upgrade
Post-Bid
Davis Junction, IL

Sewage Treatment Plant
Post-Bid
Hudson, IL 61748

West Side Water Reclamation Facility 2020 Phase III Expansion
Results
$16,000,000 to $20,000,000 est. value
Saint Charles, IL 60175

Wastewater Treatment Plant Improvements WWTP #1 Phase D
Results
East Peoria, IL 61611

Bar Screen Replacement Project
Renovation
Post-Bid
Toluca, IL

Water System Disinfection Conversion
Results
Northbrook, IL 60062

Wastewater Treatment Facility UV Disinfection
Infrastructure
Post-Bid
Metropolis, IL

Wastewater Treatment Facility Improvements
Results
Less than $7,120,000 est. value
Stockton, IL

Electric Motor Rehabilitation
Renovation
Post-Bid
$380,000 est. value
Chicago, IL

Installation of Disc Filters and Other Improvements at The Hanover Park Water Reclamation Plant
Results
Less than $3,600,000 est. value
Chicago, IL

Repair and Replacement of Certain Portions of the Sludge De-Watering Building
Renovation
Post-Bid
$200,000 est. value
Chillicothe, IL

Furnish, Deliver and Install Coarse Screensat the Stickney Water Reclamation Plant
Results
Less than $6,000,000 est. value
Cicero, IL 60804

Last Updated 04/27/2022 12:59 PM
Project Title

Aerobic Digester Conversion

Physical Address View project details and contacts
City, State (County) La Salle, IL 61301   (La Salle County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Converting the existing anaerobic digester to an aerobic digester. Ancillary equipment as part of the anaerobic digestion process including, but not limited to, the cover, heat exchanger, gas handling equipment, biogas piping, gas compressor and gas flare will be removed as part of this project. Two (2) positive displacement blowers will be provided as the air source for the aerobic digestion process. New stainless steel piping will be installed from the blower to the new coarse bubble diffusers within the tank. The sludge transfer pump will be replaced including associated piping and valves. The sludge recirculation piping will also be reconfigured. Improvements include all ancillary sitework, structural, architectural, process piping and equipment, plumbing, heating, ventilation, air conditioning, electrical, and instrumentation and controls.

Details

Sewage Treatment Plant, Renovation.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents