Similar Projects
Kendall Campus Makers Lab
Design
$5,000,000 to $7,000,000 est. value
Kendall, FL

CasaCuba Culture Center
New Construction - 58,000 SF
Design
$23,000,000 est. value
Miami, FL 33199

Mdc Wolfson Bldg. 2000 Artificial Intelligence
Renovation
Sub-Bidding
$2,200,000 est. value
Miami, FL 33132

Miami Dade College North Campus Artificial Intelligence Center
Post-Bid
$2,950,000 to $3,185,000 est. value
Miami, FL 33132

Building 2000 Hvac Equipment Replacement
Post-Bid
Kendall, FL 33176

Continuing Services Contract to Provide Minor Construction Management (CM) Services
Renovation
Results
Less than $200,000 est. value

Public-Private Partnership (P3) to Construct and Operate a Research Facility
New Construction - 30,000 SF
Results
Lakeland, FL 33868

Homestead Campus New Student Success Center
New Construction - 65,000 SF
Construction
Less than $22,865,661 est. value
Homestead, FL 33030

Miami Dade College West Campus, Structural Improvements Phase IIIA
Construction
Medley, Miami, FL 33178

Homestead Campus - Temporary Classroom Trailers Installation
Post-Bid
Homestead, FL

Wolfson Campus Building 2000 Upgrades
Renovation
Results
$5,500,000 to $8,500,000 est. value
Miami, FL 33132

St.Thomas University - Student Housing
New Construction
Construction
$22,000,000 est. value
Hialeah, FL 33054

Engineering Building
New Construction
Post-Bid
$60,000,000 est. value

FIU-CSC CM Consultant
Term Contract
Results
$4,000,000 est. value
Miami, FL

MDC Wolfson - Building 600 - Hospitality Upgrades
Renovation
Post-Bid
Less than $1,500,000 est. value
Miami, FL 33132

Reported 04/27/2022 12:00 AM
Project Title

Continuing Services General Contractors 2022

Physical Address View project details and contacts
City, State (County) Miami, FL   (Miami-Dade County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Continuing Services Contracts for Modesto A. Maidique Campus (MMC), Biscayne Bay Campus (BBC), Engineering Center (EC), and other properties in South Florida managed by FIU. Project Description: The general contractor will be the single point of responsibility for performance of the project construction contracts, functioning as an independent contractor, publicly bidding trade contracts. Continuing Services Contracts are specific projects for renovations, alterations, and additions that have a basic construction budget estimated to be $500,000.00 or less.

Details

College/University, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents