Similar Projects
Grade, Drain, Bridge and Surface - US 34
Infrastructure
Design
$15,034,590 CJ est. value
Sayre, OK 73662

Grade, Drain, Bridge and Surface - US 34
Infrastructure
Design
$15,034,590 CJ est. value
Sayre, OK 73662

12" Waterline Extension and Storm Sewer
Infrastructure
Bidding
$500,000 CJ est. value
Elk City, OK 73644

12" Waterline Extension and Storm Sewer
Infrastructure
Bidding
$500,000 CJ est. value
Elk City, OK 73644

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Water System Improvements
Infrastructure
Results
$1,250,000 to $1,330,000 est. value
Elk City, OK 73644

Two North Fork of the Red River Crossings and Meter System Upgrade
Infrastructure
Results
$310,000 est. value
Carter, OK

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

2022 Sewer Line Replacement Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Erick, OK 73645

Utilities - SH 152
Infrastructure
Design
$272,500 CJ est. value
Sayre, OK 73662

Pavement Rehabilitation - SH 6
Infrastructure
Design
$5,832,299 CJ est. value
Sayre, OK 73662

Widen, Resurface and Bridge - SH 152
Infrastructure
Design
$9,122,911 CJ est. value
Sayre, OK 73662

Widen, Resurface and Bridge - SH 152
Infrastructure
Design
$9,831,313 CJ est. value
Sayre, OK 73662

Utilities - SH 152
Infrastructure
Design
$250,000 CJ est. value
Sayre, OK 73662

Last Updated 11/22/2022 03:33 AM
Project Title

SH 152 - Utilities

Physical Address View project details and contacts
City, State (County) Sayre, OK 73662   (Beckham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $327,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SH-152: Begin on the East Side of the Sh-30 Jctand Extend East 4.1 Miles. Ut for (04) As of August 17, 2022, the project is in Final Planning status. Anticipated letting month/year is August, 2022. Length : 4.100 Mi OKDOT - SH 152 - Utilities *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents