Similar Projects
Cut and Shoot Water Plant 3
New Construction, Renovation
Bidding
$250,000 est. value
Cut and Shoot, TX

Water Plant Phase 1 for Magnolia Springs for Sig Magnolia LP
Post-Bid
TX

Phase I Water Plant
Infrastructure
Post-Bid
TX

Renovations to Water Plant No. 1
Renovation
Results
New Caney, TX 77357

Water Blending Plant 1 and 3 Improvements
Results
Less than $135,000 est. value
Montgomery, TX

Chateau Woods Water Plant No. 3
New Construction
Post-Bid
Conroe, TX 77385

Pine Lake Cove Water Plant
Results
Conroe, TX

Water Plant
New Construction
Post-Bid
TX

Water Plant 1 and 3 Improvements
Results
Conroe, TX

Water Plant No. 1 and Lift Station No. 2 Rehabilitation
Addition
Post-Bid
Spring, TX 77386

Water Plant No. 2 Motor Control Center Replacement
New Construction
Results
Shenandoah, TX

East Montgomery County Municipal Utility District No. 13 Water Plant 1 Phase 1
Infrastructure
Post-Bid
$220,000 est. value
Conroe, TX

Water Treatment Services
Results
$20,000 est. value

Proposed Jasper Well and Plant Improvements
Results
$3,250,000 est. value
TX

Water Supply Plant Number 2 - Phase 1
Renovation
Results
TX

Reported 07/23/2022 12:00 AM
Project Title

Wastewater Treatment Plant - Phase 1

Physical Address View project details and contacts
City, State (County) Conroe, TX 77306   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022,
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project site is located at the north of SH 242 near the intersection of FM 1314 and SH 242.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents