Similar Projects
JCISD Phase 2 Campus Redevelopment
New Construction, Renovation, Infrastructure - 44,419 SF
Bidding
$8,000,000 CJ est. value
Jackson, MI 49203

Hot Mix Asphalt Overlay, Shoulders, Culvert Replacement, Guardrail Upgrades and Pavement Markings on Sharon Valley Road
Infrastructure
Bidding
$1,162,000 CJ est. value
Brooklyn, MI 49230

I-94 Rehabilitation/Reconstruction
Post-Bid
MI

RFP Design - Mental Health Office Remodel and Addition - Parnall Correctional Facility
Addition, Demolition, Build-out, Infrastructure
Post-Bid
$100,000 CJ est. value
Jackson, MI 49201

12.72 Mi of Mainline And Ramp Alternate
Infrastructure
Results
Jackson, Parma, MI

3.67 Mi of Hot Mix Asphalt and Aggregate Trail Includes Culvert Replacements, Sidewalk Ramps, Landscaping Features, Fencing, Signing and Pavement Markings Along the Mike Levine Lakelands Trail State Park
Infrastructure, Alteration
Results
MI

New Elementary School - 2022 Bond - Western School District
Demolition, New Construction, Renovation, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Parma, MI 49269

Concord Elementary - 2022 Bond - Concord Community Schools
Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Concord, MI 49237

Hot Mix Asphalt Cold in-place Recycling, Striping, Ditch Cleanout, Spot Guardrail and Pavement Markings on Badgley Road
Infrastructure
Bidding
$644,000 CJ est. value
Summit Township, MI 49203

Falling Waters Trail HMA Overlay
Infrastructure
Post-Bid
$400,000 est. value
Spring Arbor, MI 49283

Bridge Reconstruction
New Construction, Infrastructure
Results
Jackson, MI

Middle School - 2022 Bond - Concord Community Schools
Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Concord, MI 49237

RFQ - Progressive Design/Build Services for WWTP Improvements
Infrastructure
Bidding
$1,000,000 CJ est. value
Michigan Center, MI 49254

Boat Launch Site Work and Installation
Infrastructure
Post-Bid
$600,000 est. value
Jackson, MI

Up to 137.32 Lnmi Of Hot Mix Asphalt Crack Treatment
Infrastructure
Results

Last Updated 05/30/2023 08:32 PM
Project Title

MDOC Charles Egeler Reception and Guidance Center Paving Repairs / Replacement

Physical Address View project details and contacts
City, State (County) Jackson, MI 49203   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $989,800 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

File No. 472/23048.RWG Charles Egeler Reception and Guidance Center - Paving Repair/Replacement 3855 Cooper St., Jackson, Michigan 49201 The Project includes, but is not necessarily limited to, Soil Erosion and Sedimentation Controls, crushing and shaping existing asphalt pavements, removal of concrete curb and flatwork, removal of asphalt pavement and aggregate base, earth excavation and grading, furnishing and placing base aggregate, bituminous paving, concrete curb and flatwork, asphalt crack filling, surface seal coating, pavement marking, furnish and spread topsoil, hydroseeding and site restoration.

Details

2,500 SF.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents