Similar Projects
Trenchless Steel Pipe Installation (Bore and Jack)
Infrastructure
Bidding

Trenchless Steel Pipe Installation (Bore and Jack)
Infrastructure
Bidding

WWTP Erosion Discharge Repair
Post-Bid
Clinton, NC

Erosion Control Material - FY20-21
Term Contract
Post-Bid
Jacksonville, NC 28540

Dorothea Drive Drainage Improvements (Formal)
Results
Raleigh, NC

Springside Culvert Replacement
Results
Clemmons, NC 27012

Carriage Park Entrance Culvert Rehabilitation
Construction
Hendersonville, NC 28791

Box Culvert Scour Repairs - Harnett
Infrastructure
Bidding
NC

Pond Breach and French Drain Package of the E-51 Woods Creek Elementary School Project
Post-Bid
Cary, NC

USDA FS NFsNC Tusquitee RD Shuler Creek Stream Restoration Project
Results
$25,000 to $100,000 est. value
Murphy, NC 28906

Catawba River Bank Stabilization
Infrastructure
Bidding
$246,000 est. value
Marion, NC 28752

Pathways Elementary School Exterior Drainage
Post-Bid
Hillsborough, NC 27278

Reinforced Concrete Pipe
Term Contract
Results
Whiteville, NC 28472

22-08-SW Linear Park Drain Line Repair
Infrastructure
Bidding
Fayetteville, NC 28301

Streambank Repairs (Formal)
Post-Bid
Raleigh, NC

Last Updated 09/21/2021 11:50 AM
Project Title

Emergency Watershed Protection Program - Recovery Measures

Physical Address View project details and contacts
City, State (County) New Bern, NC 28560   (Craven County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide implementation of recovery measures that include construction of a compacted earth berms as part of a multi-site stabilization project located in Craven County. Project Location See Request for Proposal Page No 13 to 15.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents