Similar Projects
Full Maintenance Services
Design
Beaumont, Galveston, Houston, TX 77002

Landscape Development Highway:SL8
Bidding
Less than $4,863,815 est. value
TX

Tree Trimming and Brush Removal
Post-Bid
Less than $202,432 est. value
TX

Mowing Services
Term Contract
Post-Bid
Deer Park, TX

Construction of the Hardscape and Landscape to Serve Harris County
Results
Less than $567,211 est. value
TX

Landscaping at the Downtown Complex for Harris County
Term Contract
Results
Less than $200,000 est. value
Houston, TX 77002

Mowing and Various Maintenance Services
Post-Bid
Houston, TX 77002

Landscape Maintenance Services for Various Undeveloped Properties
Term Contract
Results
Less than $279,900 est. value
Houston, TX 77002

Bridgeland - Tuckerton Phase III Medians Landscape Improvements
Post-Bid
TX 77056

Parkland Village Section 31 - Park and LS Improvements (Reserves A,B and C), Recreational Facilities
Results
Less than $1,533,586 est. value
TX

Balmoral Section 15 Landscape Improvements
Post-Bid
TX

Parkland Village Section 35 - LS Improvements (Reserves A and B), Recreational Facilities
Results
Less than $395,410 est. value
TX

Groves-Hearth Phase 2 and Section 13 - Sitework, Grading, Planting, and Irrigation
Post-Bid
TX

Property Boundary Vegetation Removal and Pruning
Term Contract
Results
Less than $515,000 est. value
TX

Richmond Median – Chimney Rock To S. Rice
Post-Bid
Houston, TX 77000

Reported 02/03/2021 12:00 AM
Project Title

Champion Forest Drive 6 Irrigation Header

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Champion Forest Drive 6” Irrigation Header for Champions Municipal Utility District located along Champion Forest Drive between Strack Road and Bermuda Dunes Drive. The purpose of this project is to provide a single irrigation header to supply potable water to an irrigation system that will be installed in the future along Champion Forest Drive and can be connected to a future reclaimed water system. work consists of: Install 4-inch AWWA C-900 PURPLE reclaimed water line, including bends and fittings Install 6-inch AWWA C-900 PURPLE reclaimed water line by trenchless construction, including bends and fittings Install 12-inch steel casing by trenchless construction, including all fittings. Install 6-inch gate valve and box, and temporary blow off valve and box. Install 6-inch by 4-inch tapping sleeve and valve. Install 6-inch plug and clamp with stake aboveground. Install 2-inch stubout minimum 1-foot above the ground, including 2-inch gate valve, bends, and fittings. Install 4-inch double check valve backflow preventer. Install meter vault for 4-inch meter including all appurtenances and drain line. Trench Safety, as required per Specification 01561. Implementation and maintenance of traffic control plan. Site Restoration, including removing and replacing concrete sidewalks and pavement, curbs, damaged turf, plants, shrubs, and trees.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents