Similar Projects
Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

Olympus Master Plan
New Construction - 861,283 SF
Conception
$10,000,000 CJ est. value
Clermont, FL 34711

Laura Street Trio
New Construction, Renovation - 160,000 SF
Design
$165,000,000 est. value
Jacksonville, FL 32202

Former Flea World Redevelopment
New Construction - 2,400,000 SF
Design
Sanford, FL 32773

Home2 Suites Hotel
New Construction - 63,000 SF
Bidding
$17,000,000 est. value
Jacksonville, FL 32204

Tru by Hilton
New Construction - 46,634 SF
Sub-Bidding
$8,500,000 est. value
Miramar, FL 33027

AC Hotel by Marriott
New Construction - 71,700 SF
Post-Bid
$12,930,000 est. value
Jacksonville, FL 32246

Hampton Inn & Suites
New Construction - 40,292 SF
Post-Bid
Callaway, FL 32404

Acquire/Rehabilitate/Manage Small Motel for Residential Rental Units (Covid-19)
Results
Less than $1,250,000 est. value
Tampa, FL 33601

Rome Yard Mixed Use Development
Results
Tampa, FL 33602

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Miami River
New Construction - 3,678,706 SF
Construction
Less than $310,000,000 est. value
Miami, FL

Palm House Hotel
Renovation
Pending Verification
Palm Beach, FL 33480

Thompson Hotel - Hyatt
New Construction - 111,000 SF
Pending Verification
Tampa, FL 33602

Parrish Farms - Master Plan
New Construction - 4,000,000 SF
Conception
$10,000,000 CJ est. value
FL

Last Updated 02/15/2022 08:58 AM
Project Title

Hyatt Place Hotel

Physical Address View project details and contacts
City, State (County) Melbourne, FL 32901   (Brevard County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method
Project Status Construction Commenced September 2021, Construction Completion Expected March 2023
Bids Due View project details and contacts
Estimated Value $18,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Hotel to include: A rooftop bar with kitchen, ground floor pool, fitness center and limited-service restaurant for hotel guests.

Details

1 Hotel/Motel, 5 Stories Above Grade, 88,805 SF New Construction 130 Unit(s), 5.80 Acres.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 13 - Special Construction, Swimming Pools, On-Grade Swimming Pools, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents