Similar Projects
Reported | 04/01/2022 12:00 AM |
Project Title | Furnace Street Sidewalk Construction Project |
Physical Address | View project details and contacts |
City, State (County) | Poultney, VT (Rutland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacement of approximately 450 feet of asphalt sidewalk with concrete sidewalk along the north side of Furnace Street (VT-30) near the Poultney High School. The project is being constructed to replace the existing sidewalk that is badly deteriorated and non ADA compliant. The new sidewalk will be a curbless Portland concrete sidewalk 5’ wide by 5” thick with a 10” crushed gravel subbase, and 8” thick where it crosses any driveway (specifications for all concrete shall be 3500 psi). |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |