Similar Projects
Pavement Repair Services, Blanket Purchase Agreement, Cape Cod Canal, Locations in Bourne & Sandwich, Ma
Design
$250,000 est. value
Bourne, Sandwich, MA

Intersection Improvements at Sandwich Road and Route 151
Bidding
$98,000 est. value
Falmouth, MA 02536

2021 Transportation Improvements Along Winter Street
Bidding
Barnstable, MA

ELM Street Reconstruction
Post-Bid
Less than $5,500,000 est. value
Bridgewater, MA

Permanent Trench Patch Repair
Term Contract
Post-Bid
Less than $151,755 est. value
Braintree, Cohasset, Duxbury, Hanover, Hingham, Hull, Marshfield, Milton, Norwell, Pembroke, Scituate, MA

Intersection Improvements at Liberty Street and County Road
Results
$570,000 est. value
Hanson, MA

Crack Sealing
Results
Less than $507,837 est. value
Braintree, Cohasset, Duxbury, Hanover, Hingham, Hull, Marshfield, Milton, Norwell, Pembroke, Scituate, Wellesley, MA

Roadway Management
Post-Bid
Less than $151,755 est. value
Braintree, Cohasset, Duxbury, Hanover, Hingham, Hull, Marshfield, Milton, Norwell, Pembroke, Scituate, MA 02111

Resurfacing and Related Work (including 6 Bridges) along Sections of Route 25
Results
Less than $7,702,000 est. value
Bourne, Wareham, MA 02571

Micro-Surfacing, Random-Crack Sealing by Fiber Reinforced Method, Cape Sealing and Hot in-Place Asphalt Recycling
Post-Bid
Less than $300,000 est. value
Rockland, MA 02370

Roadway Reconstruction and Related Work (Including Signals) along a Section of Route 18 (Bedford Street)
Results
Less than $7,766,175 est. value
East Bridgewater, MA 02333

Road Construction Using Cold In Place Recycling
Post-Bid
$300,000 est. value
Rockland, MA 02370

Intersection Improvements and Related Work North Quincy Street at Boundary Avenue and Chestnut Street
Results
Less than $1,707,419 est. value
Abington, Brockton, MA

Class 1 Bituminous Concrete and Miscellaneous Paving
Post-Bid
Less than $822,453 est. value
Wareham, MA 02571

Intersection Improvements and Related Work (Including Signals) at Iyannough (Route 28) and Yarmouth Roads
Results
Less than $10,588,000 est. value
Barnstable, MA 02630

Last Updated 06/10/2020 11:56 AM
Project Title

Resurfacing and Related Work (Including Ramps and 5 Bridges) along a Section af Route 3 (Pilgrims Highway)

Physical Address View project details and contacts
City, State (County) Bourne, Plymouth, MA 02532 (Barnstable, Plymouth Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,477,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $72000","100." "0.500","a","Clearing And Grubbing","101." "21.000","a","Selective Clearing And Thinning For Roadside Clearance","102.02" "154.000","Ft","Temporary Tree Protection Fence","102.52" "50.000","Ea","Tree Removed (Excluding Stump) Diameter Under 24 Inches","105.40" "30.000","Ea","Tree Removed (Excluding Stump) Diameter 24 Inches And Over","105.43" "120.000","Cy","Unclassified Excavation","120.1" "31.000","Cy","Topsoil Excavated And Stacked","125." "200.000","Sy","Reinforced Concrete Deck Excavation (Full Depth)","127.4" "30.000","Cy","Reinforced Concrete Deck Excavation (Partial Depth)","127.41" "70.000","Sy","Bridge Pavement Excavation","129.6" "50.000","Sy","Bridge Pavement Excavation At Plug Joint","129.62" "5.000","Cy","Class b Trench Excavation","142." "5.000","Cy","Class b Rock Excavation","144." "75.000","Cy","Ordinary Borrow","150." "120.000","Cy","Gravel Borrow - Type c","151.01" "10.000","Ton","Disposal Of Treated Wood Products","184.1" "1.000","Ea","Catch Basin","201." "525.000","Ea","Drainage Structure Adjusted","220." "175.000","Ft","Drainage Structure Rebuilt","220.2" "1.000","Ea","Drainage Structure Change In Type","220.3" "5.000","Ea","Frame And Cover","221." "25.000","Ea","Frame And Cover - Secured","221.1" "550.000","Ea","Frame And Grate - Massdot Bar Type","222." "5.000","Ea","Frame And Grate - Massdot Cascade Type","222.1" "555.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "780.000","Cy","Removal Of Drainage Structure Sediment","227.3" "1200.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "5.000","Sf","Masonry Plug","227.4" "35.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "1.000","Ea","12 Inch Reinforced Concrete Pipe Flared End","242.12" "25.000","Cy","Stone For Outlet Protection","258.1" "25.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "19550.000","Ft","Pavement Milling Mulch For Shoulders","402.13" "1250.000","Sy","Bridge Pavement Micromilling","415.11" "4000.000","Sy","Pavement Fine Milling","415.2" "385000.000","Sy","Pavement Micro Milling","415.3" "880.000","Ton","Hma For Patching","451." "35000.000","Gal","Asphalt Emulsion For Tack Coat","452." "190650.000","Ft","Hma Joint Sealant","453." "120.000","Ton","Superpave Waterproofing Surface Course (Ssc-w-9.5)","457.1" "32750.000","Ton","Superpave Surface Course-High Performance(Scc-12.5-Hp)","457.232" "275.000","Ton","Hot Mix Asphalt Berm, Type a","470." "10.000","Ton","Asphalt Mixtures For Temporary Work","472." "161300.000","Ft","Milled Rumble Strip","477." "225.000","Ft","Sawing & Sealing Joints In Asphalt Pavement At Bridges","482.31" "360.000","Ft","Sawcutting Asphalt Pavement For Box Widening","482.5" "290.000","Ft","Granite Edging Type Sb - Straight","511.1" "2860.000","Ft","Edging Removed And Reset","583." "290.000","Ft","Edging Removed And Discarded","597." "31200.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "15.000","Ea","Trailing Anchorage","627.1" "5.000","Ea","Guardrail End Treatment, Tl-3 (Double Faced)","627.73" "15.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "15.000","Ea","Guardrail Flare End Treatment, Tl-3","627.93" "20.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "12.000","Ea","Transition To Bridge Rail","628.24" "31200.000","Ft","Highway Guard Removed And Discarded","630.2" "95.000","Ea","Guardrail Post - Steel","632." "95.000","Ea","Guardrail Offset Block - Thrie Beam","633.1" "95.000","Ea","Thrie Beam Guard Panel","634.1" "1.000","Ea","Silt Sack","697.1" "30.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "30.000","Cy","Loam Borrow","751." "25.000","Cy","Topsoil Rehandled And Spread","752." "230.000","Sy","Seeding","765." "95.000","Sy","Seeding - Infiltration Basin/Swale","765.457" "17050.000","Ft","Sediment Control Barrier","767.121" "15600.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "190.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "230.000","Ea","Demountable Reflectorized Delineator - Guard Rail","833.5" "130.000","Ea","Delineation For Guard Rail Termini","833.7" "20.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "20.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/2 Brkway Post Assemblies-Steel","848.1" "440.000","Day","Traffic Cones For Traffic Management","851.1" "2400.000","Sf","Safety Signing For Traffic Management","852." "400.000","Ft","Temporary Barrier Removed And Reset","853.21" "800.000","Ft","Temporary Barrier (Tl-3)","853.23" "875.000","Day","Truck Mounted Attenuator","853.403" "2.000","Ea","Temporary Impact Attenuator For Shoulder, Capable Of Redirection","853.42" "2.000","Ea","Temporary Impact Attenuator For Shoulder, Capable Of Redirection, Removed And Reset","853.421" "380.000","Day","Temporary Illumination For Work Zone","853.8" "216200.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "25850.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "875.000","Day","Temporary Portable Rumble Strips","854.6" "875.000","Day","Arrow Board","856." "730.000","Day","Portable Changeable Message Sign","856.12" "107840.000","Day","Reflectorized Drum","859." "730.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "1000.000","Ea","Slotted Pavement Marker One-Way White","864.31" "360.000","Ea","Slotted Pavement Marker Two-Way White/Red","864.33" "360.000","Ea","Slotted Pavement Marker Two-Way Yellow/Red","864.34" "114500.000","Ft","6 Inch Wet Reflective Recessed White Line (Polyurea)","868.206" "7100.000","Ft","12 Inch Wet Reflective Recessed White Line (Polyurea)","868.212" "2000.000","Ft","4 Inch Wet Reflective Recessed White Line (Preformed)","868.304" "94500.000","Ft","6 Inch Wet Reflective Recessed Yellow Line (Polyurea)","869.206" "20.000","Ea","Traffic Sign Removed And Reset","874.2" "5.000","Ea","Traffic Sign Removed And Stacked","874.4" "90.000","Cy","Rapid Setting Concrete (Low Absorption)","904.14" "13000.000","Sf","Exposed Concrete Deck Sealing","908.11" "2750.000","Lb","Steel Reinforcement For Structures - Epoxy Coated","910.1" "10000.000","Sf","Concrete Protective Coating","964.21" "100.000","Sy","Membrane Waterproofing For Bridge Decks","965." "220.000","Ft","Asphaltic Bridge Joint System - Binder Only","971.2" "330.000","Ft","Precompressed Joint Sealer System","973.1" "25.000","Sf","Sediment Forebay Paving","988.01" "5350.000","Sf","Temporary Protective Shielding","994.1"

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents