Similar Projects
Reproductive Possibilities Office Addition
Addition, Demolition, Infrastructure - 4,673 SF
Conception
$1,000,000 CJ est. value
Montvale, NJ 07645

Wyckoff Avenue Residential Group Home
New Construction, Infrastructure
Conception
$378,000 CJ est. value
Waldwick, NJ 07463

85 and 99 State Street Apartments
New Construction - 80,711 SF
Design
$25,000,000 est. value
Hackensack, NJ 07601

Affordable Units
New Construction
Design
Saddle Brook, NJ 07663

Olsen Park Recreation Center Project - Block 1.01 and 64.01, Lot 1 and 1
New Construction - 21,042 SF
Post-Bid
$300,000 est. value
Bogota, NJ 07603

Morningside at Wallington Phase 1 (Building 8)
New Construction, Infrastructure - 61,739 SF
Post-Bid
$5,000,000 CJ est. value
Wallington, NJ 07057

2020 Road Program Center Street
Infrastructure
Results
$184,506 CJ est. value
Little Ferry, NJ 07643

CDBG FY' 2020 & 2021 Niehaus Avenue Road Improvements
Infrastructure
Results
$250,552 CJ est. value
Little Ferry, NJ 07643

The River Club
New Construction - 8,000 SF
Construction
$100,000,000 est. value
Bogota, NJ 07603

Special-Needs Housing
Renovation
Construction
Ridgewood, NJ

Main Street Mixed-Use
New Construction - 4,653 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Hackensack, NJ 07601

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

Multifamily Residential
New Construction
Design
Wallington, NJ 07057

Fabrication and/or Installation of Structural Steel & High and Low Pressure Pipe Work
Infrastructure
Post-Bid
$190,000 CJ est. value
Camden, NJ 08104

BCIA/BNBMC Building 14D - Ground Floor Gymnasium, Office Buildout Project
Renovation, Build-Out
Results
Paramus, NJ 07652

Last Updated 02/02/2023 08:35 AM
Project Title

Alfred Avenue Redevelopment

Physical Address View project details and contacts
City, State (County) Teaneck, NJ 07666   (Bergen County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Office, Site Development
Contracting Method Bids by Invitation
Project Status Seeking Site Plan Approvals, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $93,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 258-unit multi-residential development. As of February 2, 2023, this project was seeking approvals with Teaneck Planning Board on December 8, 2022. Information regarding a general contractor has not been released. A firm construction timeline has not been confirmed. *

Details

6 Stories Above Grade, Parking Spaces, 382 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents