Similar Projects
WCCW MSU Building Climate Control Improvements
Alteration
Bidding
$860,000 to $1,010,000 est. value
Gig Harbor, WA 98332

York Elementary School HVAC Upgrades Project
Alteration
Bidding
$900,000 est. value
Vancouver, WA 98682

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

North Franklin School District Connell High School HVAC Replacements
Alteration
Results
Connell, Pasco, WA 99326

51st Circle HVAC Purchase and Installation
Alteration
Results
Vancouver, WA 98661

ESH-EL-WL-HVAC Compliance and Monitoring
Alteration
Bidding
$1,070,555 to $1,183,245 est. value
Medical Lake, WA 99022

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

PPWWTF Solids Drying Heat Exchanger Repairs
Alteration
Results
$200,000 to $250,000 est. value
Edmonds, WA 98020

Evergreen High School HVAC Upgrades
Alteration
Bidding
$350,000 est. value
Vancouver, WA 98684

HVAC and Air Filtration Systems
Renovation, Alteration
Post-Bid
Sunnyside, WA

Headquarters Diesel Exhaust Removal System
Alteration
Results
$92,500 est. value
Belfair, WA 98528

Whittier Elementary School Boiler Replacement
Alteration
Bidding
Everett, WA 98213

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

3rd Floor Judges Chambers HVAC Project
Alteration
Results
$90,000 to $110,000 est. value
Bellingham, WA 98225

Reported 02/08/2022 12:00 AM
Project Title

Angel of the Winds Arena Chiller Replacement

Physical Address View project details and contacts
City, State (County) Everett, WA 98213   (Snohomish County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Vendor is to provide and install a plate and frame style heat exchanger chiller to replace the existing shell and tube apparatus including several peripheral devices used to cool and circulate calcium chloride brine solution, >21%, using anhydrous ammonia as the primary refrigerant. The vender also will provide and install an appropriate single pass shell and tube device to replace the existing sub-floor system heat exchanger. The sub floor heat exchanger will heat circulated calcium chloride brine solution >21% by condensing anhydrous ammonia high side gas, feeding the resulting liquid ammonia to the chiller system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents