Similar Projects
Last Updated | 04/23/2021 07:47 AM |
Project Title | AWWTP Electrical Distribution Upgrades – Phase 4 |
Physical Address | View project details and contacts |
City, State (County) | Appleton, WI 54915 (Outagamie County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Procurement, Unload, Handle, Install, Connect, Test, Commission, and Energization of a two(2) new above ground unit substations equipment (SS1 and SS2), one (1) new PDP panel, two (2) new HMI control panels, run new power and control cables throughout existing and new conduits, and provide grounding. New major electrical equipment includes but not limited to Substations that contains MV Switch, cast coil Transformers and LV Circuit breakers, new Power Distribution panel, HMI control cabinets. Work also consists of preparation of Building E with new trenches, concrete pads and replace existing lighting transformers and panels. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |