Similar Projects
Generator and Electrical Equipment Replacement
Bidding
New Berlin, WI 53151

Dimming and Lighting Network Replacement
Bidding
Less than $1,304,000 est. value
Whitewater, WI 53190

South Fork Substation MV Circuit Breakers
Post-Bid
River Falls, WI

Install Outlets Bldg 2187 in Hallway Between Rooms. 123 & 128 and in Rooms 121, 127, 129, 132, 133 (Wo 1956)
Post-Bid
Less than $25,000 est. value
WI 54656

Redundant UPS System Installation
Results
Less than $120,000 est. value
Whitewater, WI 53190

Switchgear Breaker Upgrades
Results
Less than $230,000 est. value
Madison, WI 53704

Public Works Generator Replacement
Bidding
Elkhorn, WI 53121

Uninterrupted Power Supply (UPS) and Batteries
Post-Bid
Sparta, WI 54656

2020 Public Works Garage Lighting Upgrades
Results
Less than $25,000 est. value
Monona, WI 53716

Elevator Replacement, Roger Harring Stadium -MEP
Bidding
$375,000 est. value
La Crosse, WI 54601

Replace Electrical-Building 19 607-19-107
Post-Bid
$2,000,000 to $5,000,000 est. value
Madison, WI

LED Lighting Upgrades
Results
New London, WI 54961

KICC Lighting and AV Upgrades
Bidding
Green Bay, WI 54301

Electrical Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Utility Renovations - Mechanical
Results
Less than $3,000,000 est. value
Madison, WI 53703

Last Updated 04/23/2021 07:47 AM
Project Title

AWWTP Electrical Distribution Upgrades – Phase 4

Physical Address View project details and contacts
City, State (County) Appleton, WI 54915   (Outagamie County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Procurement, Unload, Handle, Install, Connect, Test, Commission, and Energization of a two(2) new above ground unit substations equipment (SS1 and SS2), one (1) new PDP panel, two (2) new HMI control panels, run new power and control cables throughout existing and new conduits, and provide grounding. New major electrical equipment includes but not limited to Substations that contains MV Switch, cast coil Transformers and LV Circuit breakers, new Power Distribution panel, HMI control cabinets. Work also consists of preparation of Building E with new trenches, concrete pads and replace existing lighting transformers and panels.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents