Similar Projects
Maple Hill
New Construction
Design
Franklin, MA 02038

North Hill Needham - Site Plan Improvements
New Construction
Design
Needham, MA 02492

WLTP Ramp Replacement
Post-Bid
$20,000 est. value
Westwood, MA 02090

Tremont Street Pedestrian and Cyclist Improvements
Post-Bid
Boston, MA

Roadway Reconstruction (Including Bridge Replacement, Culvert Extension and Signals) Along A Section of Route 1A (Main Street)
Results
Less than $20,101,404 est. value
Walpole, MA 02081

Scheduled and Emergency Resurfacing and Related Work at Various Locations
Results
Less than $1,835,693 est. value

Maple Street Solar
New Construction
Construction
Less than $1,791,080 est. value
Bellingham, MA

Gillette Stadium Renovation
Addition, Renovation, Infrastructure
Construction
$225,000,000 CJ est. value
Foxborough, MA 02035

Hampton Court
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Brookline, MA 02446

King Street Warehouse
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Franklin, MA 02038

Edison Street Subdivision Expansion
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Weymouth, MA 02188

Complete Streets Improvements Along Eastern Avenue and East Street
Post-Bid
Dedham, MA 02026

Trash and Rodent Control Improvements
Results
Less than $127,000 est. value
Brookline, MA

Construct a New Approximately 21,700 Sf Fire Headquarters and Renovate 2,500 Sf of the Former Headquarters Building - GC
New Construction, Renovation, Infrastructure - 2,500 SF
Construction
$16,017,000 CJ est. value
Milton, MA 02186

Tri-Town Regional Water Treatment Plant
Infrastructure
Design
$70,000,000 CJ est. value
Braintree, MA 02184

Last Updated 08/22/2022 01:34 PM
Project Title

Installation of New Asphalt Sidewalks

Physical Address View project details and contacts
City, State (County) Quincy, MA 02169   (Norfolk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $678,354 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 22, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The project consist of the removal of existing sidewalks, drying yards, drying yard posts and footings, and the installation of new asphalt sidewalks. Any questions regarding the Contract Documents should be directed to David Biancavilla at BSC Group, Inc., at dbiancavilla@bscgroup.com or at 617-896-4347 no later than 7/14/22 @ 12:00 P.M. The project consist of the removal and replacement of all of the site asphalt sidewalks and the removal of all of the site drying yard pavement, posts, and footings.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents