Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

SR 410/0.75 miles W of East Winter Gate - Culvert Lining
Infrastructure
Conception
$450,000 CJ est. value
Enumclaw, WA 98022

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Redmond 87
Demolition, New Construction, Infrastructure - 8,075 SF
Design
$50,000,000 CJ est. value
Redmond, WA 98052

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

2nd Avenue Mixed-Use Tower
Demolition, New Construction, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Seattle, WA 98101

Lake to Sound Trail - Segment C SeaTac - Rebid
Infrastructure
Results
$6,857,857 CJ est. value
Seatac, WA 98188

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Results
$114,775,595 CJ est. value
Issaquah, WA 98029

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Construction
$234,432,000 CJ est. value
Kirkland, WA 98033

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

Herzman Levee Setback Design
Infrastructure
Design
$500,000 CJ est. value
Coles Corner, WA 98826

Eastrail Trail Connection at Spring Boulevard - City of Bellevue
Infrastructure
Post-Bid
$7,500,000 CJ est. value
Bellevue, WA 98005

Tennis Court and Site Improvements at Ingraham High School
Renovation, Infrastructure
Results
Seattle, WA 98133

Last Updated 10/13/2023 06:32 PM
Project Title

Well 4 Facility Improvements - City of Auburn

Physical Address View project details and contacts
City, State (County) Auburn, WA 98002   (King County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $499,170 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of the Project: The major items of work include mechanical and electrical improvements to the Well 4 Facility, including well pump piping and valve replacement and control panel modifications and replacement. The proposed bid range for the project is from $550,000 to $600,000. The entire project, including cleanup, shall be physically completed within 160 working days. Questions regarding this solicitation should be directed to Contact Builders Exchange of Washington at 425.258.1303 should you require assistance The project owner reserves the right to reject any and all bids, waive technicalities or irregularities, and to accept any bid if it is believed to be in the best interest of the City of Auburn.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents