Similar Projects
RFQ/P Engineering - Geotechnical Engineering for Site Design and Construction Documents Services
Infrastructure - 60,000 SF
Conception
$15,000,000 CJ est. value
Chesterfield, VA 23832

RFP Design - Scale-up Center
New Construction, Infrastructure - 60,000 SF
Design
$15,000,000 CJ est. value
Chesterfield, VA 23832

RFP Engineering - Improve Access and Accessibility
Infrastructure
Bidding
$300,000 CJ est. value
Petersburg, VA 23803

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

IDIQ A/E Civil Structural NAVFAC Washington
Results
$150,000 to $15,000,000 est. value

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

A-E and Design Services for Industrial and Research Facilities
Results
$5,000,000 to $75,000,000 est. value
Washington, DC

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

Southern Region Facilities Architect-Engineer Multiple Award Contracts
Results
$2,500 to $6,000,000 est. value

Last Updated 04/04/2023 11:33 PM
Project Title

RFP Engineering - Improve HVAC Campuswide for Infectious Aerosol Control

Physical Address View project details and contacts
City, State (County) Petersburg, VA 23806   (Petersburg City County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $29,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 4, 2023, there was no award. All bids rejected. A pre-proposal conference will not be held. In compliance with this Request For Proposals, which includes the attached Table of Contents and all provisions and appendices attached and referenced therein, and subject to all the terms and conditions set forth herein, the undersigned offers and agrees to furnish the services described in the RFP cited above and submit this signed proposal which includes this completed and signed page, the completed and signed Forms AE-1, AE-1A, AE-2, AE-3, AE-4, AE-5 and AE-6 (Attachment A)and other data as required by the RFP. It is understood that this proposal and the scope of services may be modified, by mutual agreement in subsequent negotiations. Improve HVAC Campuswide for Infectious Aerosol Control The purpose of this RFP is to solicit proposals with the intent to enter into a contract through competitive negotiations for the professional services of an Architectural/Engineering firm, authorized to do business in the Commonwealth of Virginia, with demonstrated experience in: A. Design of mechanical systems and building automation controls; B. Evaluating and making recommendations for improving mechanical heating, cooling, ventilation, filtration, and humidity controls in buildings; C. This includes designing the proper equipment and building automation system (BAS) controls for maximum energy optimization for each building and their occupants. All inquiries for information must be in writing and should be directed to: Debra AC. Sulla; Phone # (804) 524-5719; dacsulla@vsu.eduby COB May 31, 2022; Questions will NOT be addressed after this date. Confirmed shortlist

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents