Similar Projects
RFQ D/B - Hill Air Force Base B225 Area D Renovation
Demolition, New Construction, Renovation, Infrastructure
Design
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

RFQ Contractor - Design Bid Build Composite Aircraft Antenna Calibration Facility
New Construction, Infrastructure - 32,000 SF
Bidding
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

Maintenance Dock Expansion
Renovation
Post-Bid
$10,000,000 to $25,000,000 est. value
Hill Air Force Base, UT

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Navy OPS Support Center
Results
$10,000,000 to $25,000,000 est. value
Hill AFB, UT

UTTR CMCC at Hill AFB, UT
Results
$25,000,000 to $100,000,000 est. value
Clearfield, UT

Design Bid Build Composite Aircraft Antenna Calibration Facility
New Construction - 32,000 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Hill AFB, UT

GSA R8 Utah Full Facility Maintenance Services
Term Contract
Post-Bid

DBB Ddhu Lot 4 Hill Air Force Base, UT
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Hill AFB, UT

Two-Phase Design-Build Construction of The Ground Based Strategic Deterrent (GBSD) Training and Collaboration Center (TACC)
New Construction
Post-Bid
$25,000,000 to $100,000,000 est. value

IDIQ MACC for Natural Gas and POL Fuel System Projects at Various Government Installations within the NAVFAC SW Area of Responsibility
Renovation
Post-Bid
$50,000 to $10,000,000 est. value

Indefinite Delivery Contract (Idc) For Vertical Architectural-Engineering (A-E) Services Which Typically Support Military Design And Interagency & International Services (Iis) For U.S Army Corps Of En
New Construction
Post-Bid

Hill AFB - Multiple Award IDIQ Minor Construction
New Construction, Renovation, Alteration
Post-Bid
$500 to $50,000 est. value
Hill AFB, UT

USACE Spk DB Construction - Building 225 Area D Renovation - Hill AFB, UT
Renovation
Post-Bid
$25,000,000 to $100,000,000 est. value
Hill Air Force Base, UT 84056

Demo Building 134
Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Hill Air Force Base, UT 84056

Last Updated 10/20/2022 05:03 AM
Project Title

RFQ - Electrical Preventative Maintenance (EPM) Phase 3 Services

Physical Address View project details and contacts
City, State (County) Hill Air Force Base, UT 84056   (Davis County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

Synopsis: NOTICE: This is not a solicitation but rather a Sources Sought Synopsis to determine potential sources for information and planning purposes only. Any information submitted by respondents to this sources sought synopsis is voluntary and will not be returned. The Government will not reimburse any costs incurred or associated with the submission of information in response to this notice. 1. Purpose: The purpose of this Sources Sought is to conduct market research to determine if responsible sources exist, to assist in determining if this effort can be competitive and/or a total Small Business Set-Aside. The proposed North American Industry Classification Systems (NAICS) Code is 238210 - Electrical Contractors and Other Wiring Installation Contractors with a corresponding size standard of $16.5M. The Government will use this information to determine the best acquisition strategy for this procurement. The Government is interested in all small businesses to include 8(a), Service-Disabled Veteran-Owned, Hubzone, and Women-Owned small business concerns. The Government requests that interested parties respond to this notice if applicable and identify your small business status to the identified NAICS code. Additionally, please provide any anticipated teaming arrangements, along with a description of similar services offered to the Government and to commercial customers for the past five years in order to determine if the requirement will go full and open or have a set-aside. Any responses involving teaming agreements should delineate between the work that will be accomplished by the prime and the work accomplished by the teaming partners. 2. Program Details: The potential requirement will consist of the Contractor providing all of the following qualifications/requirements for one of the below listed services: Electrical Preventative Maintenance (EPM) Phase 3 Services: Service Type: The purpose of the Electrical Preventative Maintenance (EPM), Phase 3, effort is to achieve National Fire Protection Association (NFPA) 70B and NFPA 70E compliance for 18 buildings located at Hill Air Force Base (AFB), UT. Compliance shall be achieved by creating and adhering to a program management plan that manages the risks associated with obsolete equipment and unforeseen repairs and replacements in an environment that cannot sustain unplanned outages. See the Hill AFB 5-year Priority Plan below: Table 1: Hill AFB Priority Plan Locations of Work: Hill Air Force Base (AFB), Utah Scope: The overall efforts of EPM Phase 3 shall include a comprehensive Project Management Plan (PMP) to bring Hill AFB into compliance with NFPA 70, NFPA 70E, and NFPA 70B. The PMP shall demonstrate the Contractor's plan to achieve compliance, while simultaneously managing and mitigating risk associated with electrical hazards, potential equipment failures due to operation and testing, and long lead-times for replacement parts due to obsolescence. The PMP shall include a Contract Work Breakdown Structure (CWBS) outlining the overall execution of the project. The Contractor shall commence work to bring priority buildings into NFPA compliance once the PMP is accepted and an award is issued by the Government. In addition to the PMP, the Contractor shall deliver key documentation as described in the Performance-based Work Statement (PWS) and provide training/familiarization to Government personnel to support on-going Government sustainment. In addition to the inspections, testing, maintenance, and documentation, the Contractor shall replace high priority equipment selected by the Government at each building on the Priority Plan. Technical Requirements: The technical section of the PWS describes requirements for the PMP and other key documentation including Obsolescense Survey, Risk Management Plan, Component/Sub-system Test and Inspection Reports, Electrical Drawings (EDs) and Single Line Diagrams (SLDs), EasyPower Study Reports, and Reliability Growth Management Baseline Report. Also included are the requirements for system labeling and training/familiarization of Government personnel. Contractor Personnel: Contractor's field engineers and technicians shall be NETA or NICET certified to perform inspection, testing, and maintenance on electrical distribution systems. Therefore, they will meet the Occupational Safety and Health Administration (OSHA) requirements for qualified personnel. Contractor's engineers shall possess an engineering degree from an ABET accredited institution. Professional Engineers shall be registered as professional engineers in the state of Utah. Engineers performing calculations and engineering studies, shall have a minimum of three (3) years' experience performing said calculations and engineering studies. The Contractor shall have at a minimum of ten (10) years' experience performing the types of services described in the PWS. 3. Requests for Information (RFI) for Industry: Below are the current RFIs that the Government has for all interested parties: NOTE: Please submit electronic response indicating capability to supply the aforementioned item(s) via line card or published description (no more than 10 pages) as well as POC (name, telephone # and email address) along with Contractor's CAGE, unique entity ID, and the physical location of your facility to the individuals listed within this notice. All work shall be performed at the above listed locations. This request may not directly lead to a Request for Quotation/Proposal. Deadline for submission is 5:00 p.m. MST, 07 Nov 2022. Required Information: Any interested party who can offer all of the above may submit electronic reply addressing each of the above items. Response deadline: 5:00 p.m. MST, 07 Nov 2022 Where to send responses: Electronically: Primary Point of Contact.: William Lawson william.lawson.12@us.af.mil Lindsey Field lindsey.field@us.af.mil The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents