Similar Projects
Cedar-Taylor District Townhomes
New Construction
Conception
University Heights, OH 44118

Florian Court
New Construction - 40,000 SF
Conception
$8,515,000 est. value
Cleveland, OH 44103

The Bluffs of Seven Hills
New Construction - 200,000 SF
Design
$150,000,000 est. value
Seven Hills, OH 44131

Churchill Gateway
New Construction - 54,000 SF
Design
$13,000,000 est. value
Cleveland, OH 44106

Patch and Paint 2020 Willson Family Package #2
Post-Bid
Cleveland, OH 44103

Laundry Facility - Woodhill Homes
- 730 SF
Results
Cleveland, OH 44104

Patch and Paint 2019 Cedar Estates Package #2
Results
Cleveland, OH 44104

Mason Drive Subdivision
New Construction
Construction
Parma, OH 44134

Slate Townhomes
New Construction - 7,750 SF
Construction
Cleveland, OH 44100

Town Center Drive Housing
New Construction
Pending Verification
Broadview Heights, OH 44147

West 33rd Street Townhouse Development
New Construction
Pending Verification
Cleveland, OH 44113

Riverhaus Townhomes
New Construction - 24,000 SF
Conception
Chagrin Falls, OH 44022

Greenwood Townhomes
New Construction
Design
Cleveland, OH 44113

Patch and Paint 2019 Outhwaite Homes Package #1
Results
Cleveland, OH 44104

Parkway Crossing Townhomes
New Construction
Construction
Westlake, OH 44145

Reported 06/03/2020 12:00 AM
Project Title

Patch and Paint 2020 Willson Family Package 3

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44104   (Cuyahoga County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of comprehensive, complete plaster / drywall patch and repair; repainting at various residences. Contractor to use lead safe practices throughout the duration of construction. Contractor must follow all lead abatement procedures including all local, state and federal regulations. The project consists of selective repairs in locations of occupied dwelling units as directed by CMHA Personnel. The work may also consists of, but is not limited to, drywall/plaster patch and repair of walls and ceilings, re-painting of walls/ceilings, baseboards, doors, door jambs, handrails, clean and painting of radiators, and painting of exterior porch flooring. Unit prices will be established for each work item. The work includes all labor, materials and equipment for the work per below scope of work. Location: a. 1919 East 55th Street, Unit #307 (1 Bedroom) b. 5542 Perkins Avenue, Unit #12 (4 Bedroom) c. 5546 Perkins Avenue, Unit #14 (4 Bedroom) d. 1888 East 59th Street, Unit #23 (4 Bedroom) e. 1908 East 59th Street, Unit #38 (4 Bedroom)

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents