Similar Projects
Maple Grove Middle School
New Construction
Post-Bid
Mapleton, UT 84664

Spanish Fork High School Rebuild
Post-Bid
Spanish Fork, UT 84660

Building 72 Eae Master Plan and Phase 1 Buildout
Results
Less than $328,231 est. value
Salt Lake City, UT

Cottonwood High Theater Remodel
Renovation
Results
Less than $100,000 est. value
Murray, UT 84121

American Academy of Innovation Charter School
Addition - 3,285 SF
Construction
South Jordan, UT 84095

Mountain Sunrise Academy Charter School
New Construction - 40,096 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Saratoga Springs, UT 84043

Beehive Academy
New Construction - 77,584 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Draper, UT 84020

Micron Middle School Seminary
New Construction
Pending Verification
Lehi, UT 84043

Timpview High School Replacement
New Construction, Demolition - 400,000 SF
Post-Bid
$115,000,000 est. value
Provo, UT 84604

Portable Classroom Relocation from Orem to Ogden
Results
$60,000 est. value
Harrisville, UT 84404

New Middle School for Alpine School District
New Construction
Construction
Less than $41,000,000 est. value
Lehi, UT 84043

ASD Micron Middle School 435
Post-Bid
Lehi, UT 84043

Portable Classroom General Repairs
Term Contract
Results
Less than $40,000 est. value
Salt Lake City, UT

Granite Education Center Lobby and Cafe Remodel
Construction
$300,000 to $350,000 est. value
Salt Lake City, UT 84115

Davinci Academy - Suites D, E, & F
Renovation - 3,814 SF
Post-Bid
Kaysville, UT 84037

Last Updated 02/07/2020 10:05 AM
Project Title

Construction Management and General Construction

Physical Address View project details and contacts
City, State (County) Price, UT 84501   (Carbon County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

These include an addition at Carbon High School, renovations to Helper Middle School, and a new transportation facility at the district office building site. Carbon High School New main entry and administration, new media center, added classrooms, reworked site for bus and student drop off, renovated existing media center and administration areas, upgraded mechanical systems. Helper Middle School structural upgrades to floor and roof members, expansion of cafeteria and media center, revamp of exterior, new bus drop off at main entry Transportation new bus and fleet maintenance building, bus parking with outlets for engine block heaters at stalls, renovation of existing storage for maintenance.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents